My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/22/2021 (3)
CBCC
>
Meetings
>
2020's
>
2021
>
06/22/2021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 1:33:06 PM
Creation date
5/31/2022 12:20:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/22/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(7) Tank disinfection in accordance with AWWA C652. <br />d. Optional Add On No. 1: Interior Concrete Dome Coatings Application <br />(1) Pressure wash at a minimum of 3,500 psi to remove salts, dirt, dust, grease, oil, and other soluble <br />contaminants from the substrate. <br />(2) Ultra high water blast at a minimum of 20,000 psi to remove existing coatings, laitance, curing <br />compounds, and other foreign contaminants from the substrate while achieving a surface profile equal <br />to ICRI-CSP5. <br />(3) Resurface with Tnemec Series 218 Morta,clad at a minimum rate of 1/16 -inch. <br />(4) Apply a prime coat of Tnemec Series 120-5002 Vinester at 15.0-18.0 mils DFT. <br />(5) Apply a finish coat of Tnemec Series 120-5001 Vinester at 15.0-18.0 mils DFT. <br />(6) Perform high voltage holiday testing. <br />e. Optional Add On No. 2: Interior Piping Coatings Application <br />(1) Pressure wash at a minimum of 3,500 psi to remove salts, dirt, dust, grease, oil, and other soluble <br />contaminants from the substrate. <br />(2) Abrasive blast to remove existing coatings, rust, corrosion, and other foreign contaminants from the <br />substrate while achieving a minimum angular anchor profile of 3.0 mils. <br />(3) Apply a prime coat of Tnemec Series 120-5002 Vinester at 15.0-18.0 mils DFT. <br />(4) Apply a finish coat of Tnemec Series 120-5001 Vinester at 15.0-18.0 mils DFT. <br />f. Optional Add On No. 3: Addition of Wall Pipes <br />(1) Addition of 4 — 8" SS FLG-FLG Wall Pipes through tank wall at manhole elevation. <br />3. MATERIALS AND SERVICES FURNISHED BY CLIENT OR OTHERS <br />It is understood that the following services shall be provided by others without expense to CCR: <br />a. Client will grant or obtain free access to the site for all equipment and personnel necessary for CCR to <br />perform the work set forth in this Proposal. The Client will notify any and all processors of the project site <br />that Client has granted CCR free access to the site. CCR will take reasonable precautions to minimize <br />damage to the site, but it is understood by Client that, in the normal course of work, some damage may <br />occur, and the correction of such damage is no. part of this Agreement unless so specified in the Proposal. <br />b. The Client is responsible for the accuracy of locations for all subterranean structures and utilities. CCR will <br />take responsible precautions to avoid known subterranean structures, and the Client waives any claim <br />against CCR, and agrees to defend, indemnify, and hold CCR harmless from any claim or liability for injury <br />or loss, including costs to defend, arising from damage done to subterranean structures and utilities not <br />identified or accurately located. In addition, Client agrees to compensate CCR for any time spent or <br />107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.