Laserfiche WebLink
EXHIBIT A - SCOPE OF WORK <br />It is understood the COUNTY Public Works Department (Traffic Operations) desires to develop a Wash <br />Rack apron in conjunction with the new Traffic Operations new building project. The proposed Wash <br />Rack apron will be located on the north end of the Traffic Ops complex and will support the necessary <br />infrastructure and utilities to support the wash down of IRC equipment at this location. <br />The CONSULTANT proposes to provide the COUNTY the below scope of work associated with the <br />Master Development Plan and as further described below. <br />Task 1— Civil Design & Permitting <br />A. Construction Plans <br />The CONSULTANT will prepare 24" x 36" design drawings for the Wash Rack pad which will <br />include the following: Existing Conditions Plan, General Notes and Specifications, Erosion <br />Control Plan, Demolition Plan, Site Plan, Grading and Drainage Plan and applicable details <br />sheets. It is understood the Wash Rack design shall be incorporated into the Master Traffic Ops <br />new building plans set as it will be constructed in conjunction with the Traffic Ops re- <br />development. <br />B. County Reviews <br />The CONSULTANT will coordinate with the COUNTY on two (2) progress reviews with at the 50 <br />and 100 percent levels of design completion. Either a single set of review comments may be <br />provided to CONSULTANT prior/or after each review meeting, or comments may be provided <br />via redlines to proposed design plans. This task includes revisions to plans from each COUNTY <br />review within reasonable scope of the project. <br />C. Permitting <br />The CONSULTANT will prepare the following permit applications and associated submittals for <br />the applicable agencies required for review and approval of the Wash Rack. <br />• Indian River County Department of Health permit <br />• Florida Department of Environmental Protection <br />• Indian River County Department of Utilities <br />• Indian River County Site Plan <br />NOTE: With the exception of the FDEP Industrial Wastewater Permit /and or Exemption, all <br />other permits required for the Wash Rack shall be included in the Traffic Ops New Building <br />permits. <br />Task 2 - Cost Estimates <br />The CONSULTANT will produce an Opinion of Probable Cost (EOPC) at the 100% design milestone of <br />the project. The final plan and estimate will be provided to COUNTY based upon English units and <br />provided in digital and PDF formats. <br />