My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/05/2021 (3)
CBCC
>
Meetings
>
2020's
>
2021
>
10/05/2021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 2:30:46 PM
Creation date
5/31/2022 2:11:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/05/2021
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment 1 Work Order MM -2 <br />Moorhen Marsh Mechanical Construction Phase Services <br />10. Limitation of Responsibilities. The Consultant shall not be responsible for the acts or <br />omissions of any Contractor, or of any of their subcontractors, suppliers, or of any <br />other individual or entity performing or furnishing the Work. The Consultant shall <br />not have the authority or responsibility to stop the work of any Contractor. <br />11. Final "Substantial" Completion. Consultant will, after notice from Contractor that it <br />considers the Work ready for its intended use, in company with COUNTY and <br />Contractor, conduct a site visit to determine if the Work is substantially complete. <br />Work will be considered substantially complete following satisfactory completion of <br />all items with the exception of those identified on a final punch list. Consultant <br />anticipates completing the following items once the project is deemed substantially <br />complete: <br />• Consultant will review Record Drawings and Operation and Maintenance <br />Manuals prepared by the Contractor <br />• Consultant will assist the COUNTY to prepare and submit the substantial <br />completion form provided by Indian River County through the EJCDC front- <br />end documentation <br />12. Final Notice of Acceptability of the Work. Consultant will conduct a final site visit to <br />determine if the completed Work of Contractor is generally in accordance with the <br />Contract Documents and the final punch list. If COUNTY and Consultant agree the <br />work to be complete, Consultant will assist the COUNTY in preparing the final <br />completion EJCDC front-end documentation. Consultant shall also provide a notice <br />that the Work is generally in accordance with the Contract Documents to the best of <br />Consultant's knowledge, information, and belief based on the extent of its services <br />and based upon information provided to Consultant. <br />Information Provided By Client <br />We shall be entitled to rely on the completeness and accuracy of all information provided by the <br />COUNTY or the COUNTY's consultants or representatives. The COUNTY shall provide all information <br />requested by the Consultant during the project, including but not limited to the following: <br />1. Contractors Mechanical Related RFIs <br />2. Access to the Construction Site <br />3. Access to the COUNTY's full-time joy site inspector <br />41 Page <br />127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.