My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-082
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 3:30:26 PM
Creation date
6/8/2022 3:08:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/03/2022
Control Number
2022-082
Agenda Item Number
8.G.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for Resurfacing 69th Street from 66th Avenue to SR5/US-1
FM No.438073-1-54-01
Project Number
IRC 1639
Bid Number
2022-028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1639 <br />SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE <br />GENERAL CONDITIONS <br />SC -1.00 Introduction <br />These Supplementary Conditions amend or supplement the Standard General Conditions of the <br />Construction Contract (No. 1910-8, 1996 Edition) and other provisions of the Contract Documents as <br />indicated below. All provisions, which are not so amended or supplemented, remain in full force and <br />effect. <br />The terms used in these Supplementary Conditions will have the meanings indicated in the General <br />Conditions. <br />SC -1.01 Defined Terms <br />SC -1.01.A.20 Add the following language to the end of GC 1.01.A.20. <br />ENGINEERS's Consultant: Kimley-Horn and Associates, Inc. <br />44524 th Street, Suite 200 <br />Vero Beach, FL 32960 <br />SC -1.01.A.21. Delete paragraph GC 1.01.A.21 in its entirety. <br />SC -1.02 Terminology <br />SC -1.02.D.1, 2, and 3 Delete paragraphs GC -1.02.D.1, 2, and 3 in their entirety and insert the following <br />paragraphs in their place: <br />D. Furnish, Install, Perform, Provide <br />1. The word "furnish" shall mean to supply and deliver services, materials, or equipment to <br />the Site (or some other specified location) ready for use or installation and in usable or <br />operable condition. <br />2. The word "install" shall mean to put into use or place in final position services, materials, or <br />equipment complete and ready for intended use. <br />3. The words "perform" or "provide" shall mean to furnish and install services, materials, or <br />equipment complete and ready for intended use. <br />SC -2.05 Before Starting Construction <br />SC -2.05.C. Delete paragraph GC 2.05.0 in its entirety and insert the following paragraph in its place: <br />C. Evidence of Insurance: CONTRACTOR shall not commence work under this Contract <br />until he has obtained all insurance required under Article 5 and such insurance has <br />been delivered to the OWNER and approved by the OWNER, nor shall the <br />CONTRACTOR allow any Subcontractor to commence work on his subcontract until <br />all similar insurance required of the Subcontractor has been so obtained and <br />approved. All such insurance shall remain in effect until final payment and at all <br />times thereafter when CONTRACTOR may be correcting, removing or replacing <br />defective Work in accordance with Article 13. <br />SC -2.06 Preconstruction Conference <br />SC -2.06 Delete paragraph GC -2.06.A in its entirety and insert the following paragraph in its place: <br />Supplementary Conditions - 00800-2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\1-Admin\Bids\Bid Documents - Advertisement\DIV <br />0 3 Conditions of the Contract - 20211207.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.