Laserfiche WebLink
IRC -1639 <br />SC -13.03 Test and Inspections <br />SC -13.03.13. Delete paragraph GC -13.03.8 in its entirety, and insert the following sentences in its place: <br />B. OWNER shall employ and pay for the services of an independent testing laboratory to perform all <br />initial inspections, tests, or approvals required by the Contract Documents except those <br />inspections, tests, or approvals listed immediately below. Subsequent inspections, tests, or <br />approvals required after initial failing inspections, tests, or approvals shall be paid for by the <br />CONTRACTOR by back charge to subsequent applications for payment. The CONTRACTOR shall <br />arrange, obtain, and pay for the following inspections, tests, or approvals: <br />inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.1) below; <br />costs incurred in connection with tests or inspections conducted pursuant to paragraph <br />13.04.13 shall be paid as provided in said paragraph 13.04.13; <br />tests otherwise specifically provided in the Contract Documents. <br />SC-13.OS OWNER May Stop the Work <br />SC -13.05.A. Delete paragraph GC -13.05.A in its entirety and insert the following paragraph in its place: <br />A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled workers or <br />suitable materials or equipment, or fails to comply with permit requirements, or fails to <br />comply with the technical specifications, or fails to perform the Work in such a way that <br />the completed Work will conform to the Contract Documents, OWNER may order CON- <br />TRACTOR to stop the Work, or any portion thereof, until the cause for such order has been <br />eliminated; however, this right of OWNER to stop the Work shall not give rise to any duty <br />on the part of OWNER to exercise this right for the benefit of CONTRACTOR, any <br />Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee <br />or agent of any of them. <br />SC -13.07 Correction Period <br />SC -13.07 A. Delete the first sentence of paragraph GC -13.07.A in its entirety and insert the following sentence <br />in its place <br />A. If within one year after the date of Final Completion or such longer period of time as may <br />be prescribed by Laws or Regulations or by the terms of any applicable special guarantee <br />required by the Contract Documents or by any specific provision of the Contract <br />Documents, any Work is found to be defective, or if the repair of any damages to the land <br />or areas made available for CONTRACTOR's use by OWNER or permitted by Laws and <br />Regulations as contemplated in paragraph 6.11.A is found to be defective, CONTRACTOR <br />shall promptly, without cost to OWNER and in accordance with OWNER's written <br />instructions: (i) repair such defective land or areas, or (ii) correct such defective Work or, if <br />the defective Work has been rejected by OWNER, remove it from the Project and replace it <br />with Work that is not defective, and (iii) satisfactorily correct or repair or remove and <br />replace any damage to other Work, to the work of others or other land or areas resulting <br />therefrom. <br />SC -13.07 B. Delete paragraph GC -13.07.8 in its entirety and insert the following sentence in its place <br />In special circumstances where a particular item of equipment is placed in continuous <br />service before Final Completion of all the Work, the correction period for that item may <br />Supplementary Conditions - 00800-9 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\1-Admin\Bids\Bid Documents - Advertisement\DIV <br />0-3—Conditions of the Contract - 20211207.doex <br />