My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-082
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 3:30:26 PM
Creation date
6/8/2022 3:08:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/03/2022
Control Number
2022-082
Agenda Item Number
8.G.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for Resurfacing 69th Street from 66th Avenue to SR5/US-1
FM No.438073-1-54-01
Project Number
IRC 1639
Bid Number
2022-028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1639 <br />SECTION 00948 — Work Change Directive <br />No. <br />DATE OF ISSUANCE: <br />OWNER: <br />CONTRACTOR <br />Project: <br />OWNER's Project No. <br />FM No.: <br />EFFECTIVE DATE: <br />Indian River Coun <br />69TH STREET FROM 66TH AVENUE TO SRS/US-1, RESURFACING <br />IRC -1639 OWNER'S Bid No. 2022028 <br />438073-1-54-01 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Reason for Change Order: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />Unit Prices <br />Lump Sum <br />❑ Other: <br />By Change Order: <br />Method of determining change in <br />Contract Times <br />II Contractor's Records <br />II Engineer's Records <br />❑ Other: <br />By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />RECOMMENDED: <br />By: <br />ENGINEER (Signature) <br />Date: <br />** END OF SECTION** <br />APPROVED: <br />By: <br />OWNER (Signature) <br />Date: <br />Work Change Directive — 00948 <br />F:\PubIicWorks\ENGINEER1NG DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\t-Admin\Bids\Bid Documents - Advertisement\DIV <br />0-4—Conditions of the Contract - 20211207.docx <br />