Laserfiche WebLink
Division 1— General Requirements, IRC -1639 <br />1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br />A. After receiving approval by the ENGINEER, distribute copies of the approved initial <br />schedule and all reviewed revisions (updated) to: <br />1. Job site file. <br />2. Subcontractors. <br />3. Other concerned parties. <br />4. OWNER (two copies). <br />5. ENGINEER <br />In the cover letter, instruct recipients to report promptly to the CONTRACTOR, in <br />writing, any problems anticipated by the projections shown in the schedules. <br />+ + END OF SECTION + + <br />Construction Schedules - 01310-2 <br />F:\Pub1icWorks\ENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SC0P)\1-Admin\Bids\Bid Documents - Advertisement\DIV <br />1 GENERAL REQUIREMENTS - 20211207.docx <br />