My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-082
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 3:30:26 PM
Creation date
6/8/2022 3:08:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/03/2022
Control Number
2022-082
Agenda Item Number
8.G.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for Resurfacing 69th Street from 66th Avenue to SR5/US-1
FM No.438073-1-54-01
Project Number
IRC 1639
Bid Number
2022-028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1—General Requirements, IRC -1639 <br />B. TEMPORARY SANITARY FACILITIES <br />1. Provide temporary toilet facilities separate from the job office. Maintain <br />these during the entire period of construction under this Contract for the <br />use of all construction personnel on the job. Provide enough chemical <br />toilets to conveniently serve the needs of all personnel. Properly seclude <br />toilet facilities from public observation. <br />2. Chemical toilets and their maintenance shall meet the requirements of <br />State and local health regulations and ordinances. Immediately correct <br />any facilities or maintenance methods failing to meet these requirements. <br />Upon completion of work, remove the facilities from the premises. <br />1.4 SECURITY <br />Full time watchmen will not be specifically required as a part of the Contract, but the <br />CONTRACTOR shall provide inspection of work area daily and shall take whatever <br />measures are necessary to protect the safety of the public, workmen, and materials, and <br />provide for the security of the site, both day and night. <br />1.5 TEMPORARY CONTROLS <br />Take all necessary precautions to control dust and mud associated with the work of this <br />Contract. In dry weather, spray dusty areas daily with water in order to control dust. Take <br />necessary steps to prevent the tracking of mud onto adjacent streets and highways. <br />1.6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br />Remove the various temporary facilities, services, and controls and legally dispose of <br />them as soon as the work is complete. The areas of the site used for temporary facilities <br />shall be properly reconditioned and restored to a condition acceptable to the OWNER. <br />+ + END OF SECTION + + <br />Construction Facilities and Temporary Controls - 01520-2 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\1-Admin\Bids\Bid Documents - Advertisement\DIV <br />1 GENERAL REQUIREMENTS - 20211207.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.