Laserfiche WebLink
Division 2 -Technical Provisions, IRC -1639 <br />Work as a result of failure to comply with this Section, the Contract time clock will continue <br />to run. <br />E. In addition to these Specifications, comply with Chapter 4 - "Best Management Practices for <br />Erosion and Sedimentation Control" and Chapter 5 — "Best Management Practices for <br />Dewatering" of the Florida Erosion and Sediment Control Inspector's Manual. In the event <br />of a conflict between the referenced chapters and these Specifications, the more stringent <br />requirement shall prevail. <br />F. Submit to SJRWMD a "Notice to District of Dewatering Activity" (SJRWMD Form No. 40C- <br />2.900(12)) prior to commencement of dewatering in accordance with F.A.C. 40C-2.042(9). <br />Provide a copy of the Notice to Indian River County. <br />1.2 PERMITS <br />A. The OWNER has obtained certain permits for this project and they are listed in paragraph <br />6.08.13 of the EJCDC Standard General Conditions of the Construction Contract (General <br />Conditions). Per paragraph 6.08.0 of the General Conditions, apply for and obtain all other <br />required federal, state, and local permits, licenses, sampling, and tests. <br />B. Provide copies of all approved permits to the OWNER and ENGINEER and comply with all <br />conditions contained in all permits at no extra cost to the OWNER. If there is a conflict <br />between any permit requirement and these Specifications or requirements between <br />permits, the more stringent specification or requirement shall govern. <br />C. Pay for all required water quality sampling and laboratory tests. <br />1.3 GENERAL <br />A. Do not begin any other construction work until the pollution control and treatment system <br />has been constructed in accordance with approved plans, permits, and these Specifications; <br />and the installed system has been examined by the OWNER for compliance. <br />B. From time to time, the OWNER or ENGINEER will inspect the pollution control and treatment <br />system and may take effluent samples for analysis by a testing laboratory selected and paid <br />for by the OWNER. If at any time, the OWNER or ENGINEER determines that the pollution <br />control and treatment system is not in compliance with the approved system, the OWNER <br />or ENGINEER will shut the portion of the project down that is not in compliance, and it shall <br />remain shut -down until the pollution control and treatment system is properly constructed <br />or repaired, and complies with the approved pollution control and treatment system plans, <br />specifications, contract documents, and permits. <br />C. Schedule construction to minimize erosion and stormwater runoff from the construction <br />site. Implement erosion control measures on disturbed areas as soon as practicable in <br />portions of the site where construction activities have temporarily or permanently ceased, <br />but in no case more than 7 days after the construction activity in that portion of the site has <br />Division 2 —Technical Provisions - 01025-6 <br />F:\Pub1cWorks\ENGINEERING DIVISION PROJECTS\1639 65th Street 66th Avenue to US -1 Resurfacing (SCOP)\1-Admin\Bids\Bid Documents - Advertisement\DIV <br />2 TECHNICAL PROVISIONS - IRC-1639.docx <br />