My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-082
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 3:30:26 PM
Creation date
6/8/2022 3:08:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/03/2022
Control Number
2022-082
Agenda Item Number
8.G.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for Resurfacing 69th Street from 66th Avenue to SR5/US-1
FM No.438073-1-54-01
Project Number
IRC 1639
Bid Number
2022-028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC -1639 <br />(In the case of a tie, preference will be given to businesses with drug-free workplace <br />programs) <br />10. Has the firm ever been charged with noncompliance of any public policy or rules? <br />No <br />[If your answer is "yes", then attach a separate page to this questionnaire that explains <br />the circumstances and list the project name, Owner, and the Owner's telephone <br />number for each project.] <br />11. Attach to this questionnaire, a notarized financial statement and other information that <br />documents the firm's financial strength and history. <br />12. Has the firm ever defaulted on any of its projects? No <br />[If your answer is "yes", then attach a separate page to this questionnaire that explains <br />the circumstances and list the project name, Owner, and the Owner's telephone <br />number for each project in which a default occurred.] <br />13. Attach a separate page to this questionnaire that summarizes the firm's current workload <br />and that demonstrates its ability to meet the project schedule. <br />14. Name of person who inspected the site of the proposed work for the firm: <br />Name: Timothy Rose <br />Date of Inspections: <br />15. Name of on-site Project Foreman: Christopher Dial <br />3116/22 <br />Number of years of experience with similar projects as a Project Foreman: 16 <br />16. Name of Project Manager: Timothy Rose <br />Number of years of experience with similar projects as a Project Manager: 37 <br />17. State your total bonding capacity: <br />40,000,000.00 <br />18. State your bonding capacity per job: 15,000,000.00 <br />19. Please provide name, address, telephone number, and contact person of your bonding <br />company: <br />Westfield Ins. Co., 1 Park Cir., Westfield Center, OH 44251, Dan Sheehan 904-661-4708 <br />[The remainder of this page was left blank intentionally] <br />Qualifications Questionnaire - 00456 - 2 <br />FAPubIIc WorksIENGINEERING DIVISION PROJECTS\1639 89th Street 66th Avenue to US -1 Resurfacing (SCOP)11-AdMniBidslBid Documents - Adver isement0V <br />0_1—Bidding Documents - 20210824.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.