Laserfiche WebLink
Consultant will attend a kick-off meeting to discuss the operation of the existing <br />treatment system since the previous permit renewal, collect data, and discuss potential <br />revisions to the permit through the application renewal. Consultant will conduct a site <br />visit with operations staff to review the operation of the existing Spoonbill Marsh and <br />stormwater pump station, and attend a pre-application/site meeting with FDEP staff, if <br />required as suggested in their notice of permit renewal. <br />Consultant will prepare applicable applications and supporting information to maintain <br />the existing rated capacity. Application forms including 62-620.910(1) and 2DC 62- <br />620.910 (18) forms will be prepared and submitted along with supporting tables, graphs, <br />and process flow diagram. Consultant will update the existing engineering report <br />prepared for the previous up -rating. <br />Consultant will prepare a list of data and documentation needed for the preparation of the <br />permit renewal application. Information such as background water quality data, <br />treatment plant water quality, MOR's, daily plant flow data, non-compliance notices, <br />historical concentrate water characteristic data, etc., as a minimum, will be provided by <br />IRCU for use in preparing the permit application. <br />The following parameters are included as part of the existing operating permit and will be <br />reviewed as part of the permit application. Almost all of these parameters are measured <br />at the effluent location (EFF -003, INT -003) of the treatment system. Where practical and <br />if desired, the frequency and/or elimination of testing will be requested in the permitting <br />process. <br />• Flow <br />Chlorine <br />• pH <br />Temperature <br />• Phosphorus (Total) <br />Ortho -phosphorus <br />• Nitrogen (Total) <br />Mercury <br />• Chromium, Hex (Cr6) <br />Ammonia Nitrogen <br />• Copper <br />Iron <br />• Hydrogen Sulfide <br />Gross Alpha <br />• Dissolved Oxygen <br />Radium 226/228 <br />• Fluoride <br />Conductivity (Salinity) <br />• Chronic Whole Effluent Toxicity — Mysid Shrimp (Americamysis (Mysidopsis) <br />bahia) <br />• Chronic Whole Effluent Toxicity — Silverside (Menidia beryllina) <br />Consultant will rely on the calculations for Total Daily Mass Load (TMDL) and <br />Spoonbill Marsh system performance as outlined in the permit. <br />Consultant will prepare a draft application with supporting tables, graphs, trends, and <br />explanations to the permit application renewal and submit draft copies to IRCU staff for <br />review one month prior to submittal deadline. Consultant will attend a review meeting to <br />F:\Utilities\00_UTILITY - AGENDA TEMPLATE & GUIDELINES\2022 Agenda Items\050322 BCC Agenda Items\North County <br />WTP Permit Renewal 2023\Final Drafts\Work Order 8 Draft Changes Per Budget Department_nb.doc.docx <br />Page 2 of 5 <br />