My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/7/1995
CBCC
>
Meetings
>
1990's
>
1995
>
11/7/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:13 PM
Creation date
6/16/2015 3:10:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/07/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternative No. 2 <br />Construct a drainage pipe beneath the FEC Railroad in this area.. <br />The cost is estimated to be $50,000 for just the pipe berteat-h- the <br />railroad. Furthermore; a drainage ditch/retention area would be <br />needed between US 1 and the FEC Railroad, thence construction of <br />a 1,000' drainage pipe to the Vero Shores Canal System. Due to <br />boring and jacking under US 1, securing land and easements along <br />US 1 and Vero Shores Subdivision, and connecting an outfall pipe to <br />Vero Shores seawalls, the cost is estimated as follows: <br />1 acre for retention area $120,000 <br />Piping 1000'@ $100/ft $ 100,000 <br />Seawall Connection $ 50,000 <br />Engineering/Permitting $ 40,000 <br />Construction of Pond $ 50,000 <br />FEC Railroad Piping 50,000 <br />$ 410,000 <br />10% Contingency 41,000 <br />Estimated Cost $ 451,000 <br />Alternative No. 3 <br />Since the County owned wetland west of Old Dixie is* heavily <br />overgrown with Brazilian Pepper and exotics, it is difficult to inspect <br />the area for abandoned flow wells that may be free flowing. A clearing <br />and enhancement program is being planned by the Solid Waste <br />Disposal District for this area. Clearing, permitting, and <br />enhancement will be funded by the District. Improvements may <br />increase storage capacity. Once cleared, staff will search for <br />abandoned flow wells. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends Alternative No. 1 and No. 3 as being the most cost effective. In <br />the Local Option Sales Tax Program, $1,100,000 has been budgeted in FY98/99 <br />for the stormwater improvements. If these funds could be appropriated from <br />another fund and reimbursed by the Local Option Sales Tax Program in FY98/99, <br />the engineering could begin this Fiscal Year. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Adams, the Board (by a 4-0 vote, <br />Commissioner Tippin being temporarily absent) <br />unanimously approved negotiations pursuant to <br />Alternative #1 and directed staff to pursue <br />Alternative #3, as set forth in staff's memorandum. <br />PROPOSED BOSTON MARKET RESTAURANT R/W DEDICATION <br />ALONG US#1 SOUTH OF 18TH STREET — CITY OF VERO BEACH <br />The Board reviewed a Memorandum of October 25, 1995: <br />TO: James E. Chandler, <br />County Administrator <br />FROM: James W. Davis, P.E. <br />DATE: October 25, 1995 <br />Public Works Director <br />SUBJECT: Proposed Boston Market Restaurant Right -of -Way Dedication Along US 1 <br />South of 18th Street in the City of Vero Beach <br />REF. LEITER Scott B. McGuire to Jim Davis dated Oct. 20, 1995 <br />NOVEMBER 7, 1995 47 boa 96 e E 560 <br />
The URL can be used to link to this page
Your browser does not support the video tag.