Laserfiche WebLink
Work Order No. 49 <br />Indian River Boulevard <br />Pedestrian & Bicycle Access <br />Improvements Project <br />2. The Consultant will submit the construction documents and project information <br />necessary to support the County in the FDOT Small County Outreach Program (SCOP) <br />review. <br />3. A Stormwater Pollution Prevention Plan (SW3P) will be developed in conjunction with <br />this project. The site specific SW3P is a requirement of both the EPA National <br />Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater <br />Discharges from Construction Activities, and the FDEP Generic Permit for Stormwater <br />Discharges from Construction Activities. <br />4. All permit fees will be paid directly by the COUNTY and are not included in the lump <br />sum fees. <br />C. Signing and Pavement Marking Plans: <br />Signing and Pavement Marking plans shall include: Preparation of the plan layout, key <br />map, quantities (including signing and pavement marking quantity), tabulation of <br />quantities, and detail of major signs. Plans are to be prepared in accordance with the latest <br />design standards and practices (MUTCD), FDOT Standard Specifications, Indexes, and shall <br />be accurate, legible, complete in design and drawn at the same scale as the Roadway Plans, <br />furnished in reproducible form. <br />D. Signalization Plans: <br />Traffic signal modification plans will be developed to support the additional pedestrian <br />phase movements associated with the southbound and eastbound approaches to the <br />Indian River Boulevard/ 12th Street intersection. It is understood that the proposed <br />signalization improvements will be designed to meet current IRC and FDOT standards. The <br />plans will include the design and layout of proposed pedestrian signal poles, signal heads, <br />detectors, conduit, and pull boxes. <br />The plans will include all call outs, controller timing chart, signal head details, controller <br />notes, signal operating plan, and tabulation of quantities. The set of plans will include the <br />following sheets: key sheet; tabulation of quantities; general notes, and plan sheet. <br />E. Franchise Utility Coordination: <br />The Consultant will coordinate with franchise utility operators in the vicinity of the project <br />such that the proposed construction activities can be developed to minimize impacts to <br />existing utilities located within the project limits. Franchise utility adjustments, designed <br />by the respective franchise utility operator, will be requested by the Consultant and <br />reflected within the prepared construction documents. <br />Page 4 of 7 <br />