Laserfiche WebLink
Work Order No. 49 <br />Indian River Boulevard <br />Pedestrian & Bicycle Access <br />Improvements Project <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately six (6) months from the Notice to Proceed (NTP). <br />NTP <br />Initial Submittal (40% Design Drawings) <br />Interim Submittal (80% Design Drawings) <br />Final Submittal (100% Design Drawings) <br />contingent upon BOCC approval <br />4 months following NTP <br />5 months following NTP <br />6 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 6of7 <br />