My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-088
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2022 10:44:15 AM
Creation date
6/13/2022 10:39:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/10/2022
Control Number
2022-088
Agenda Item Number
15.B.3.
Entity Name
Biogas Engineering
Subject
Change Order No.1 to Agreement for High Pressure Skid System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ffimml <br />Contractor: <br />COR Originator: <br />Address: <br />Email Address: <br />BOD Change - Add Dehydration to High Pressure Skid Design <br />BIOGAS ENGINEERING <br />Ryan Rueve <br />2321 E. 28TH STREET, SIGNAL HILL, CA -90755 <br />rrueve@biogaseng.com <br />COR No.: CO#1 <br />COR Date: 4/28/2022 <br />Poject #: USH2126.100 <br />PO: TBD <br />Change Request Definition <br />Change <br />Recommended by: Indian River County <br />n <br />Description of Change/SOW Description: <br />Biogas Engineering (BGE) was recently awarded by Indian River County (Client) to provide a high pressure blower skid. The amount awarded <br />was $789,000 ($771,000 for equipment and $18,000 as an estimate for transportation). Client has since requested that BGE includes <br />equipment to dehydrate the landfill gas (LFG) prior to it being sent into the pipeline. This change -order covers the cost of providing the <br />necessary equipment to achieve this request, including the cost to engineer, size, and integrate this equipment into the high pressure blower <br />skid. The design and equipment provided will dehydrate the LFG by cooling it so that condensate will not be generated in the pipeline. This <br />change will allow the condensate sumps to be removed along the pipeline. <br />Reason for Change: <br />Client has changed the basis of design by requiring the gas to be dehydrated prior to being sent into the pipeline. <br />Change Reqest Impact <br />Cost Impact: ❑ No Change ❑� Cost Increase ❑ Cost Decreasae <br />Cost is Lump Sum of $292,570 and is additional to the original approved amount as mentioned above. The revised total will be $1,081,570 <br />(including $18k estimate for shipping). Upon approval, BGE will invoice for 15% of the change order amount. The remaining payments will be <br />included in the payment schedule that was provided for the high pressure blower skid. <br />Schedule Impact: ❑� No Change ❑ Delay ❑ No Delay <br />Authorized Signature. <br />Date Signed: <br />Name <br />Title: <br />Schedule impact is not anticipated at this time. <br />A ril 8, 2022 <br />Ryan Rueve <br />Operations Manger <br />Company Review <br />Recommendation: ❑ Approve ❑ Reject ❑ Hold <br />Reviewer Signature: see signature block on following page <br />Date Signed: <br />Name: <br />Title: <br />
The URL can be used to link to this page
Your browser does not support the video tag.