My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-089
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2022 10:59:46 AM
Creation date
6/16/2022 10:58:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
05/17/2022
Control Number
2022-089
Agenda Item Number
8.B.
Entity Name
Hinterland Group, Inc.
Subject
First Extension and Second Amendment to Agreement
for Lift Station Rehabilitation Services
Bid Number
2019047
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1- First Extension <br />Item <br />No. <br />Item Install Furnish and Description <br />p ) <br />Unit <br />Per Unit Price <br />Bid <br />Updated Per <br />Unit Price <br />1 <br />MOBILIZATION & GENERAL CONDITIONS- ORDERS UNDER $15,000 (per site) <br />LS <br />$2,500.00 <br />$2,836.50 <br />2 <br />MOBILIZATION & GENERAL CONDITIONS- ORDERS $15,000-$40,000 (per site) <br />LS <br />$2,000.00 <br />$2,269.20 <br />3 <br />MOBILIZATION & GENERAL CONDITIONS- ORDERS GREATER THAN $40,001 (per site) <br />LS <br />$1,500.00 <br />$1,701.90 <br />4 <br />INSURANCE PER CONTRACT (One time pay item each year of contract) <br />LS <br />$100.00 <br />$113.46 <br />5 <br />PUBLIC CONSTRUCTION BOND (UP TO $250,000) IF REQUIRED (per year) <br />LS <br />$5,000.00 <br />$5,673.00 <br />6 <br />VIDEO RECORDING, PRE -CONSTRUCTION (per site, up to 500 feet of roadway) <br />LS <br />$600.00 <br />$680.76 <br />7 <br />VIDEO RECORDING, POST -CONSTRUCTION (per site, up to 500 feet of roadway) <br />LS <br />$600.00 <br />$680.76 <br />8 <br />TRENCH SAFETY AND CONFINED SPACE ENTRY COMPLIANCE (per site) <br />LS <br />$100.00 <br />$113.46 <br />9 <br />MINOR MOT DESIGN & SETUP (per site, no lane closure, County right of way) <br />DAY <br />$50.00 <br />$56.73 <br />10 <br />INTERMEDIATE MOT DESIGN & SETUP (per site, single lane closure, County right of way) <br />DAY <br />$250.00 <br />$283.65 <br />11 <br />BARRICADE TYPE I or II w/ WARNING LIGHT <br />DAY <br />$5.00 <br />$5.67 <br />12 <br />BARRICADE TYPE III w/ WARNING LIGHT <br />DAY <br />$5.00 <br />$5.67 <br />13 <br />IMOT WARNING SIGNS <br />DAY <br />$5.00 <br />$5.67 <br />14 <br />STATIC ARROW BOARDS, DETOUR SIGNS <br />DAY <br />$5.00 <br />$5.67 <br />15 <br />DYNAMIC ARROW FLASHING SIGN <br />DAY <br />$35.00 <br />$39.71 <br />16 <br />VARIABLE MESSAGE TRAILER <br />DAY <br />$65.00 <br />$73.75 <br />17 <br />TRAFFIC CONES <br />DAY <br />$3.00 <br />$3.40 <br />18 <br />IFLAGMAN <br />HR <br />$40.00 <br />$45.38 <br />19 <br />CONSTRUCTION WARNING FENCE (includes up to 100 lineal feet) <br />DAY <br />$50.00 <br />$56.73 <br />20 <br />CONSTRUCTION WARNING FENCE (per lineal foot in excess of 100 feet) <br />LFDA <br />$5.00 <br />$5.67 <br />21 <br />TEMPORARY CHAIN LINK SECURITY FENCE, 6' HEIGHT (includes up to 100 lineal feet) <br />DAY <br />$150.00 <br />$170.19 <br />22 <br />TEMPORARY CHAIN LINK SECURITY FENCE, 6' HEIGHT (per lineal feet beyond 100 ft) <br />LFDA <br />$15.00 <br />$17.02 <br />23 <br />ITRAFFIC BARRIER, WATER OR SAND FILLED (includes up to 100 feet) <br />DAY <br />$50.00 <br />$56.73 <br />24 <br />TRAFFIC SAFETY BARRIER, WATER OR SAND FILLED (per lineal feet beyond 100 ft) <br />LFDA <br />$20.00 <br />$22.69 <br />25 <br />STAKED EROSION CONTROL FABRIC (includes up to 100 lineal feet) <br />DAY <br />$50.00 <br />$56.73 <br />26 <br />STAKED EROSION CONTROL FABRIC (per lineal foot in excess of 100 feet) <br />LFDA <br />$10.00 <br />$11.35 <br />27 <br />HAY BALES OR WATILES <br />LF <br />$5.00 <br />$5.67 <br />28 <br />STEEL PLATE (32 sq. ft per plate) <br />DAY <br />$25.00 <br />$28.37 <br />29 <br />LIGHT TOWER w/ GENERATOR <br />DAY <br />$50.00 <br />$56.73 <br />30 <br />4" BY-PASS PUMPING INITIAL SETUP (includes 100 feet of temporary piping) <br />EA <br />$300.00 <br />$340.38 <br />31 <br />4" BY-PASS PUMPING OPERATION <br />DAY <br />$500.00 <br />$567.30 <br />32 <br />4" BYPASS PUMPING BEYOND THE INTIAL 100 FEET <br />LF <br />$5.00 <br />$5.67 <br />33 <br />6" BY-PASS PUMPING INITIAL SETUP (includes 100 feet of temporary piping) <br />EA <br />$300.00 <br />$340.38 <br />34 <br />6" BY-PASS PUMPING OPERATION <br />DAY <br />$700.00 <br />$794.22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.