My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-089
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2022 10:59:46 AM
Creation date
6/16/2022 10:58:10 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1- First Extension <br />Item <br />Item Description (Furnish and Install) <br />No. <br />Unit <br />Per Unit Price <br />Bid <br />Updated Per <br />Unit Price <br />63 EXCAVATION & DISPOSAL OF CONCRETE SIDWALKS, DRIVEWAYS & FLATWORK <br />SY <br />$8.00 <br />$9.08 <br />64 EXCAVATION & DISPOSAL OF CONCRETE CURB <br />LF <br />$10.00 <br />$11.35 <br />65 1 EXCAVATION & DISPOSAL OF UNSUITABLE SOIL <br />CY <br />$20.00 <br />$22.69 <br />66 CLEAN IMPORT SAND BACKFILL <br />CY <br />$25.00 <br />$28.37 <br />67 FLOWABLE FILL- EXCAVATABLE (per Section 121 FDOT spec) <br />CY <br />$180.00 <br />$204.23 <br />66 LIMEROCK STABILIZED BASE MATERIAL <br />CY <br />$35.00 <br />$39.71 <br />69 IN PLACE MATERIAL TESTING - LIMEROCK BEARING RATIO - ASTM <br />EA <br />$125.00 <br />$141.83 <br />70 IN PLACE MATERIAL TESTING- MODIFIED PROCTOR TEST, AASHTO T-180 <br />EA <br />$100.00 <br />$113.46 <br />Gravity Main Installation - 6" DIP, EPDXY LINED, 0'-6' DEPTH (includes excavation, backfill & <br />71 <br />compaction) <br />LF <br />$75.00 <br />$85.10 <br />Gravity Main Installation - 8" DIP EPDXY LINED, 0'-6' DEPTH (includes excavation, backfill & <br />72 <br />compaction) <br />LF <br />$80.00 <br />$90.77 <br />Gravity Main Installation -10" DIP EPDXY LINED 0'-6' DEPTH (includes excavation, backfill & <br />73 <br />compaction) <br />LF <br />$85.00 <br />$96.44 <br />Gravity Main Installation -12" DIP, EPDXY LINED, 0'-6' DEPTH (includes excavation, backfill & <br />74 <br />compaction) <br />LF <br />$85.00 <br />$96.44 <br />Gravity Main Installation -16" DIP, EPDXY LINED, 0'-6' DEPTH (includes excavation, backfill & <br />75 <br />compaction) <br />LF <br />$100.00 <br />$113.46 <br />76 6" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction) <br />LF <br />$65.00 <br />$73.75 <br />77 8" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction) <br />LF <br />$70.00 <br />$79.42 <br />78 10" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction) <br />LF <br />$75.00 <br />$85.10 <br />79 12" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction) <br />LF <br />$80.00 <br />$90.77 <br />80 15" PVC, DR 26, 0'-6' DEPTH (includes excavation, backfill & compaction) <br />LF <br />$85.00 <br />$96.44 <br />81 8" PVC, DR 18, 0'-6' DEPTH (includes excavation, backfill & compaction) <br />LF <br />$75.00 <br />$85.10 <br />82 10" PVC, DR 18, 0'-6' DEPTH (includes excavation, backfill & compaction) <br />LF <br />$80.00 <br />$90.77 <br />83 12" PVC, DR 18, 0'-6' DEPTH (includes excavation, backfill & compaction) <br />LF <br />$85.00 <br />$96.44 <br />84 16" PVC, DR 18, 0'-6' DEPTH (includes excavation, backfill & compaction) <br />LF <br />$90.00 <br />$102.11 <br />85 4" FERNCO COUPLING w/ SHEAR RINGS <br />EA <br />$45.00 <br />$51.06 <br />86 6" FERNCO COUPLING w/ SHEAR RINGS <br />EA <br />$65.00 <br />$73.75 <br />87 8" FERNCO COUPLING w/ SHEAR RINGS <br />EA <br />$75.00 <br />$85.10 <br />88 10" FERNCO COUPLING w/ SHEAR RINGS <br />EA <br />$85.00 <br />$96.44 <br />89 12" FERNCO COUPLING w/ SHEAR RINGS <br />EA <br />$100.00 <br />$113.46 <br />90 16" FERNCO COUPLING w/ SHEAR RINGS <br />EA <br />$200.00 <br />$226.92 <br />91 IADDITIONAL EXCAVATION 6'-8' DEPTH <br />LF <br />$50.00 <br />$56.73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.