My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/14/1995
CBCC
>
Meetings
>
1990's
>
1995
>
11/14/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:13 PM
Creation date
6/16/2015 3:12:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/14/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTRAL REGIONAL WASTEWATER TREATMENT PLANT <br />EXPANSION <br />The Board reviewed the following memo dated 11/6/95: <br />DATE: NOVEMBER 6, 1995 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRAT <br />FROM: TERRANCE G. PI <br />DIRECTO OF UT T SERVICES <br />PREPARED WILLI F. MCC <br />AND'STAFFED CAPIT 'CTS ENGINEER <br />BY: DE T OF UTILITY SERVICES <br />SUBJECT: CENTRAL REGIONAL WASTEWATER TREATMENT PLANT <br />EXPANSION TO 2 MGD <br />INDIAN RIVER COUNTY PROJECT NO. IIS -95 -23 -DC <br />On October 3, 1995, the Indian River County Board of County <br />Commissioners approved the selection of and negotiations with the <br />firm of Camp Dressser and McKee, Inc., to provide design and <br />construction services for the above -referenced project. (See <br />attached agenda item and minutes..) The Utilities Department staff <br />has concluded negotiations with Camp Dresser and, McKee and is <br />prepared to proceed with the project. <br />ANALYSIS <br />The projected construction cost of this project is approximately <br />$7,000,000.00. The negotiated.engineering fees are as follows: <br />A) Services within typical fee schedule (Farmers Home <br />Administration) <br />* <br />3. <br />Site Plan <br />$ 18,000.00 <br />* <br />4. <br />Design Services <br />268,000.00 <br />* <br />5. <br />Bidding Services <br />14,000.00 <br />* <br />6. <br />Engineering (Construction) <br />211,000.00 <br />* <br />7. <br />Project Representation <br />52.000.00 <br />Total <br />$563,000.00 <br />B) Services outside typical fee schedule <br />structure <br />* <br />1. <br />Preliminary (Engineer's Report) <br />$ 21,700.00 <br />* <br />2. <br />Permitting <br />30,000.00 <br />* <br />8. <br />Subconsultants -- <br />19,500.00 <br />* <br />9. <br />Contingency ** <br />15.000.00 <br />Total $ 86,200.00 <br />* Item numbers per contract designation <br />** To be authorized by the Utilities Department Director <br />should this expenditure be required for unforseen <br />permit issues, etc. <br />November 14, 1995 21 Boa6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.