Item Number <br />Description <br />Unit <br />Quantity <br />Unit Cost <br />Amount <br />455-133-2 - 18" SQUARE x 70'- <br />117 - 1A 53rd B <br />0" MINIMUM (TEST PILE - <br />LF <br />140.00 <br />$37.00 <br />$5,180.00 <br />ABUTMENT) <br />118 - lA 53rd B <br />455-34-2 - 18" SQUARE x 55'- <br />LF <br />1045.00 <br />$37.00 <br />$38,665.00 <br />0" MINIMUM (ABUTMENT) <br />455-34-2A - 14" SQUARE x <br />119 - 1A 53rd B <br />50'-0" MINIMUM (WING <br />LF <br />600.00 <br />$32.00 <br />$19,200.00 <br />BENT) <br />120 - 1A 53rd B <br />455-137 - PILE DYNAMIC <br />LS <br />1.00 <br />$525.00 <br />$525.00 <br />LOAD TESTING <br />121- 1A 53rd B <br />455-14-5 - 8" x 8'-0" x 12'-0" <br />LF <br />312.00 <br />$315.00 <br />$98,280.00 <br />SHEET WALL <br />122 - 1A 53rd B <br />400-2-4A - CLASS II CONCRETE <br />CY <br />8.00 <br />$1,050.00 <br />$8,400.00 <br />123 - 1A 53rd B <br />415-1-4A - REINFORCING <br />LB <br />343.00 <br />$2.00 <br />$686.00 <br />STEEL <br />124 - 1A 53rd B <br />400-2-10 - CLASS II CONCRETE <br />CY <br />124.00 <br />$368.00 <br />$45,632.00 <br />125 - 1A 53rd B <br />415-1-9 - REINFORCING STEEL <br />LB <br />19570.00 <br />$1.00 <br />$19,570.00 <br />126 - 1A 53rd B <br />715-2117 - 2" DIAMETER PVC <br />LF <br />152.00 <br />$15.00 <br />$2,280.00 <br />CONDUIT <br />127 - 1A 53rd B <br />339-1 - MISCELLANEOUS <br />TN <br />8.37 <br />$250.00 <br />$2,092.50 <br />ASPHALT <br />128 - 1A 53rd B <br />530-3-3 - (ROCK RUBBLE) <br />TN <br />1232.00 <br />$95.00 <br />$117,040.00 <br />Total <br />$1,025,900.50 <br />Add the following pay items and work to the contract: <br />Added by CO 02 1 53`d Street Bridge Lump Sum LS 1.00 1 $1,867,717.85 1 $1,867,717.85 <br />Reason for Change Order: <br />The purpose of this Change Order is to compensate the Contractor to construct the 53`d Street Bridge <br />over Lateral A Canal based on the redesigned 5 -lane typical section. Further, the Contractor agreed <br />to a Lump Sum (LS) amount and an addition of sixty (60) days Contract time. There are many benefits <br />to the redesign, including being able to accommodate future growth by being able to accommodate <br />additional travel lanes. Other benefits include upgrading the bridge structure to the current FDOT <br />Standards and changing from a prestressed/post tension single deck superstructure design to a <br />prestressed Florida Slab Beam (FSB) design which decreases long-term maintenance costs & increases <br />life of the structure. The net addition to the Contract will be $841,817.35, which includes pay item <br />overruns, jobsite overhead and other indirect costs associated with the 60 -day time extension <br />necessary to complete this work plus additional maintenance of traffic & erosion control for the <br />additional 60 -day period. <br />Attachments: (List documents supporting change) <br />• Exhibit A: Contract Document List of Pay Items for 53`d Street Bridge (1 Page) <br />• Exhibit B: Schedule of Values (1 Page) <br />• Exhibit C: Change Order 02 Back-up Documentation (3 Pages) <br />o Appendix A: Engineer's Estimate and Backup Documentation (22 pages) <br />o Appendix B: Contractor's 5 Lane Cost Submittal (2 pages) <br />o Appendix C: Engineer's Analysis & Support of the 60 -Day Contract Time Extension <br />(5 pages) <br />182 <br />