My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/01/2022 (4)
CBCC
>
Meetings
>
2020's
>
2022
>
02/01/2022 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 11:58:35 AM
Creation date
6/17/2022 1:05:31 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/01/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- A & W FLOORING, INC. <br />44,93k 13351 SE 80th Street <br />Morriston, Florida 32668-5027 <br />1W Phone # (352)620-5156 <br />Fax # (352) 528-0028 <br />I <br />Name/Address <br />North County Aquatic Center <br />Dave Smith <br />1801 27th Street <br />Building A <br />Vero Beach, FL 32960-3388 <br />Attention: <br />DS <br />ESTIMATE <br />Date <br />Estimate# <br />10/29/2021 <br />1571 <br />Job# and Project Location <br />Purchase Order# <br />Account # <br />50 M Pool Remodel <br />IRC288 <br />Description <br />Qty <br />Rate <br />Total <br />SALES TAX: IF THIS ENTITY IS TAX EXEMPT, A TAX EXEMPTION CERTIFICATE <br />MUST BE PROVIDED TO A & W FLOORING, INC. - Copy provided 11-3-2021 <br />Terms & Conditions: <br />1. 100% Deposit required for materials prior to shipping. A further payment of 50% Labor <br />is due upon mobilization. The Balance of 50% Labor is due within the 30 days of receipt of <br />date invoice is submitted to: dsmith@ircgov.com Payments should be issued to A & W <br />Flooring, Inc. at: 13351 SE 80th Street, Morriston, Florida 32668-5027. Electronic Payments <br />are an acceptable option. <br />2. Prices are valid for 90 days after quotation <br />3. This proposal details the scope of work included in the above price. If any conditions are <br />found upon commencement of the work requiring additional repairs, ie underneath the liner, <br />work will stop until such time that the owner has been notified of the additional work <br />required, and has been provided with and agreed to the cost for the additional materials and <br />labor necessary to complete the work. <br />4. Demo, civil works, site works, excavation & hauling, concrete works, sealing, backfill, <br />deck construction, coping, electrical works, grounding works, mechanical works, and <br />commissioning works are not included in this price, unless specifically noted. <br />5. Project Repair date will be contingent upon all materials are shipped and on jobsite, and <br />weather is not a factor of delay, otherwise a possible date change could be required. A & W <br />Flooring, Inc. will not be responsible for liquidated damages per day thereafter if delay is <br />caused by natural disasters, weather or a delay of material shipment. Project estimated 5 <br />weeks for completion. Material Delivery is between 45 - 60 days from written approval of <br />scope. <br />Signature <br />149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.