My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/01/2022 (4)
CBCC
>
Meetings
>
2020's
>
2022
>
02/01/2022 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 11:58:35 AM
Creation date
6/17/2022 1:05:31 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/01/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alk, A & W FLOORING, INC. <br />1P13351 SE 80th Street <br />Morriston, Florida 32668-5027 <br />1W Phone # (352)620-5156 <br />Fax # (352) 528-0028 <br />I Name /Address I <br />North County Aquatic Center <br />Dave Smith <br />1801 27th Street <br />Building A <br />Vero Beach, FL 32960-3388 <br />Attention: <br />DS <br />ESTIMATE <br />Date <br />Estimate# <br />1/5/2022 <br />1581 <br />Job# and Project Location <br />Purchase Order# <br />Account # <br />50 M Pool Dewatering <br />IRC288 <br />Description <br />Qty <br />Rate <br />Total <br />3. This proposal details the scope of work included in the above price. If any conditions are <br />found upon commencement of the work requiring additional repairs, ie underneath the liner, <br />work will stop until such time that the owner has been notified of the additional work <br />required, and has been provided with and agreed to the cost for the additional materials and <br />labor necessary to complete the work. <br />4. Demo, civil works, site works, excavation & hauling, concrete works, sealing, backfill, <br />deck construction, coping, electrical works, grounding works, mechanical works, and <br />commissioning works are not included in this price, unless specifically noted. <br />5. North County Aquatic Center has agreed to and acknowledged to forever release, hold <br />harmless and indemnify A & W Flooring, Inc. of and from any and all losses, liability <br />(including liability for personal injury or property damage), claims, liens, demands, damages <br />(including consequential, incidental and punitive damages and attorney fees) and causes of <br />action relating to or arising from work performed or materials supplied by A & W Flooring, <br />Inc. Same applies to any subcontractor used for Dewatering, outside the scope of work of A & <br />W Flooring, Inc. A & W will not be held responsible for anything once the pool has been <br />drained. North County Aquatic Center is responsible for draining and refilling the pool. <br />6. Project Repair date will be contingent upon all materials are shipped and on jobsite, and <br />weather is not a factor of delay, otherwise a possible date change could be required. A & W <br />Flooring, Inc. will not be responsible for liquidated damages per day thereafter if delay is <br />caused by natural disasters, weather or a delay of material shipment. Project estimated 5 <br />weeks for completion. Material Delivery is between 45 - 60 days from written approval of <br />scope. <br />7. Permitting will be responsibility of others, not A & W Flooring, Inc. Items not specifically <br />included in the referenced quotation are not included in the Net Sell Price. <br />Signature <br />152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.