My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/01/2022 (4)
CBCC
>
Meetings
>
2020's
>
2022
>
02/01/2022 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 11:58:35 AM
Creation date
6/17/2022 1:05:31 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/01/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division by the Sub -Recipient and subsequently approved by the Division and FEMA. The <br />Sub -Recipient shall ensure that all applicable state, local and federal laws and regulations <br />are followed and documented, as appropriate. <br />The project consists of the general construction and furnishing of all materials, equipment, <br />labor and fees to minimize wildfire and reduce vegetative fuels to at -risk structures that, if <br />ignited, pose a significant threat to human life and property. <br />The Sub -Recipient shall fully perform the approved project, as described in the submitted <br />documents, in accordance with the approved scope of work, budget line item, allocation of <br />funds and applicable terms and conditions indicated herein. The Sub -Recipient shall not <br />deviate from the approved project terms and conditions. <br />Construction activities shall be completed by a qualified and licensed Florida contractor. All <br />construction activities shall be monitored by the professional of record. The Sub -Recipient <br />shall complete the project in accordance with all required permits. All work shall be <br />completed in accordance with applicable codes and standards. <br />Upon completion of the work, the Sub -Recipient shall schedule and participate in a final <br />inspection of the completed project by the local municipal or county official, or other <br />approving official, as applicable. The official shall inspect and certify that all installation was <br />in accordance with the manufacturer's specifications. Any deficiencies found during this <br />final inspection shall be corrected by the Sub -Recipient prior to Sub -Recipient's submittal <br />of the final inspection request to the Division. <br />Upon completion of Task 2, the Sub -Recipient shall submit the following documents with <br />sufficient supporting documentation, and provide a summary of all contract scope of work <br />and scope of work changes, if any. Additional documentation for closeout shall include: <br />a) A copy of the O&M plan operations and maintenance plan). <br />b) A certification stating that the plan is consistent with the guidance, meets or exceeds <br />local codes, and is in conformance with appropriate fire -related codes. <br />c) A certification stating the SOW compliance and the completion of the project following <br />rules and regulations in conformance with the Department of Forestry for rural areas <br />and the Local Fire Department for urban areas. <br />d) Letter verifying compliance with the National Historic Preservation Act, to include <br />whether archaeological materials or human remains were encountered during project <br />activities and, if so, how they were handled in accordance with Florida Statutes, Section <br />872.05. <br />e) Letter and/or documentation verifying compliance with conditions #1 through # 42 as <br />stated on the Environmental section of this document. <br />f) Proof of compliance with Project Conditions and Requirements contained herein. <br />3) During the course of this agreement, the Sub -Recipient shall submit requests for <br />reimbursement. Adequate and complete source documentation shall be submitted to <br />support all costs (federal share and local share) related to the project. In some cases, all <br />project activities may not be fully complete prior to requesting reimbursement of costs <br />incurred in completion of this scope of work; however, a partial reimbursement may be <br />requested. <br />The Sub -Recipient shall submit an Affidavit signed by the Sub -Recipient's project personnel <br />with each reimbursement request attesting to the completion of the work, that <br />disbursements or payments were made in accordance with all agreement and regulatory <br />171 <br />
The URL can be used to link to this page
Your browser does not support the video tag.