My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-104
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 11:33:38 AM
Creation date
6/20/2022 11:24:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/07/2022
Control Number
2022104
Agenda Item Number
8.J.
Entity Name
Andersen Andre Consulting Engineers, Inc.
Subject
Amendment No. 1 to Work Order AACE-1 for
Moorhen Marsh Low Energy Aquatic Plant System (LEAPS)
Project Number
IRC-2107
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANDERSEN ANDRE CONSULTING ENGINEERS, INC. <br />Geotechnical Engineering <br />Construction Materials Testing <br />Environmental Consulting <br />Indian River County Board of County Commissioners <br />Pubic Works Department <br />1801 271h Street <br />Vero Beach, FL 32960 <br />Attn: Mr. Richard Reichenbach, P.E. <br />REQUEST FOR AMENDMENT TO WORK ORDER NO. AACE-1 <br />MOORHEN MARSH LEAPS PROJECT (IRC -2107 <br />INDIAN RIVER COUNTY, FLORIDA <br />AACE File No. 21-163 <br />May 23, 2022 <br />Andersen Andre Consulting Engineers, Inc. (CONSULTANT) is pleased to provide Indian River County (CLIENT) <br />with this Request for Amendment to Work Order No. AACE-1 in connection with the construction of the Moorhen <br />Marsh LEAPS project. <br />The estimated cost of this Request for Amendment to Work Order No. AACE-1 is $47,472.00 as detailed below, and <br />is requested relative to additional man-hours and concrete testing. Please contact our office if you have any questions <br />or if you require additional information. <br />• Concrete Testing; <br />- 30 sets of concrete cylinders during normal hours @ $88.00/set .......................... $2,640.00 <br />- 30 sets of concrete cylinders during early/late hours @ $88.00/set x 1.5 .................... $3,960.00 <br />• Senior Engineering Technician('); <br />- 6 weeks @ 40 hrs/week during normal hours @ $59.00/hour ........................... $14,160.00 <br />- 6 weeks @ 40 hrs/week during early/late hours @ $59.00/hour x 1.5 ..................... $21,240.00 <br />• Senior Project Engineer; 12 weeks @ 3 hrs/week @ $120.00/hour .............................. $4,320.00 <br />• Technical Secretary; 12 weeks @ 2 hrs/week @ $48.00/hour................................... $1,152.00 <br />TOTAL ............................... $47,472.00 <br />[')Note: Our original budget included technician man-hours for 20 weeks, 40 hrs/week, Monday -Friday, 8AM to 5PM. <br />We are presently on Week No. 31 and anticipate an additional 10-12 weeks will be necessary for project completion.] <br />Best Regards, <br />ANDERSEN ANDRE CONSULTING ENGINEERS, INC. <br />Peter G. Andersen, P.E. <br />Principal Engineer <br />834 SW Swan Avenue, Port St. Lucie, Florida 34983 Ph: 772-807-9191 Fx: 772-807-9192 www.aaceinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.