My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/15/2022 (4)
CBCC
>
Meetings
>
2020's
>
2022
>
02/15/2022 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 12:32:17 PM
Creation date
6/20/2022 12:13:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/15/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 1 during this past nesting season. As Phase 2 construction is intended to wrap up this April, <br />immediate post -construction sea turtle and shore -bird monitoring will be required this season <br />for that area of construction. Year 1 post -construction Sea Turtle and Shorebird monitoring is <br />required for the Sector 3, Phase 1 portion of the project this season. Construction related <br />hardbottom monitoring is required for the entire length of Sector 3 (Year 1 post -construction for <br />Phase 1 and immediate post -construction for Phase 2). <br />The proposed Work Order No. 2018006-13, in the amount of $416,681.67, provides professional <br />services for permit required construction related environmental monitoring for Phase 1 and <br />Phase 2 which includes: <br />• Year 1 Post -Construction Biological Monitoring of Nearshore Hardbottom and Sea <br />Turtle/Shorebird Monitoring for Phase 1. (Task 1) <br />• Immediate Post -Construction Biological Monitoring of Nearshore Hardbottom and Sea <br />Turtle/Shorebird Monitoring for Phase 2 (Task 2) <br />All subsequent annual post construction environmental monitoring of the Sector 3, Phase 1 and <br />Phase 2 Project areas will be addressed through future work orders. <br />FUNDING <br />Local funding of Beach Restoration includes a portion of Local Option Tourist Tax Revenue, <br />FEMA project worksheets and a FDEP grant. Funding for construction related environmental <br />monitoring (Task 1) in the amount of $226,548.02 is budgeted and available for the Sector 3 <br />Beach Nourishment Project in the Beach Restoration Fund/Sector 3 Beach <br />Renourishment/Hurricane Matthew, Hurricane Irma and Hurricane Dorian, Account No. <br />12814472-066514-17001. Funding for post -construction related monitoring (Task 2) in the <br />amount of $190,133.65 is budgeted and available for the Sector 3 Beach and Dune <br />Nourishment Project in the Beach Restoration Fund/Sector 3 Post Construction Monitoring <br />Account No. 12814472-033490-05054. <br />Account Name <br />Account No. <br />Amount <br />Sector 3 Beach Renourishment <br />12814472-066514-17001 <br />$226,548.02 <br />Sector 3 Post Construction Monitoring <br />12814472-033490-05054 <br />$190,133.65 <br />RECOMMENDATION <br />Staff recommends the BCC authorize Work Order No. 2018006-13 in the total lump sum <br />amount of $416,681.67. Additionally, staff recommends the BCC authorize the Chairman to <br />execute Work Order No. 2018006-13. <br />ATTACHMENTS <br />APTIM WO #2018006-13 <br />WO #2018006-13 Agreement Execution <br />APPROVED AGENDA ITEM FOR: FEBRUARY 15, 2022 <br />131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.