Laserfiche WebLink
Oslo Park MSBU <br />• Based on current construction costs a mile <br />of paved roadway is approximately $1.25 <br />million dollars to design, permit, and <br />construct. This includes the necessary <br />drainage improvements to support the <br />paved roadway system. <br />Oslo Park MSBU <br />• For the purposes of this presentation staff <br />estimates that the cost to design, permit, <br />and construct 4.47 miles of roadway within <br />the designated Oslo Park district will be <br />approximately $5.5 million dollars. <br />6/17/2022 <br />1(00- 3 <br />