Laserfiche WebLink
EXHIBIT B <br />ESTIMATE FOR ENGINEERING SERVICES <br />PROJECT: IRCUFloridan WellS-1RRe lacement <br />SHEEP 1 <br />OF 1 <br />CLIENT: Indian River County Utilities <br />FILE NO. <br />ESTIMATOR MDM <br />DATE: 12/03/21 <br />DESCRIPTION: <br />Floridan Well S -1R Replacement <br />Design, permitting, construction phase <br />DIRECT LABOR MAN-HOURS <br />PRINC <br />SEN <br />PROF <br />REG <br />PROF <br />DES/ <br />P2 (JPF) <br />CLK <br />EXP <br />SUB <br />Dir Exp <br />(4.6%) <br />LINE <br />TOTAL <br />JUFH <br />NO. TASK <br />1 PREPARE DESIGN DOCS <br />Review Well #S-1&sitin <br />4 <br />2 <br />2 <br />$60 <br />1,362 <br />Prepare drawings & specs <br />4 <br />20 <br />88 <br />6 <br />$631 <br />14,347 <br />1001/o review set <br />4 <br />8 <br />12 <br />6 <br />$200 <br />$181 <br />4 317 <br />iLentzSurve <br />2 <br />4 <br />$1,500 <br />$48 <br />2,598 <br />C& W <br />2 <br />4 <br />$12,000 <br />$48 <br />13,098 <br />JLA <br />2 <br />4 <br />2 <br />$5,120 <br />$57 <br />6,419 <br />2 PREPARE DESIGN DOCS - RWM <br />Evaluate proposed RWM, hydraulic analysis <br />2 <br />8 <br />12 <br />$129 <br />2,931 <br />Prepare exhibit of RWM pipe route <br />4 <br />8 <br />$77 <br />1,745 <br />Prepare drawian s for 901%submittal <br />4 <br />8 <br />90 <br />12 <br />$584 <br />13,28 <br />90% Design meeting (1- meetinplanned) <br />2 <br />4 <br />$48 <br />1,098 <br />Detail sheets 3 Cover/Ke Ma /Notes <br />4 <br />4 <br />20 <br />4 <br />$183 <br />4,167 <br />Prepare final drawings <br />4 <br />4 <br />52 <br />12 <br />$373 <br />8,485 <br />Final Review Meeting I- tweting planned)4 <br />6 <br />8 <br />$121 <br />2,761 <br />Opinion ofprobable construction cost <br />2 <br />12 <br />4 <br />$96 <br />2,190 <br />Technical Specification Preparation <br />2 <br />6 <br />24 <br />$168 <br />3,822 <br />SOFTDlGS(I0(dS250/sanr'.% <br />81 <br />8 <br />12 <br />$2,500 <br />5147 <br />5,839 <br />SURVEYwellsRe&RW-NU <br />2 <br />4 <br />$1,500 <br />$48 <br />2,598 <br />3 PERMITTING <br />SJRW M D <br />4 <br />4 <br />$188 <br />1,472 <br />FDEP peraita &RAI <br />8 <br />10 <br />12 <br />$184 <br />4,186 <br />JLA <br />S'.730 <br />2,730 <br />4 BIDDING <br />Coordination with contractor <br />2 <br />101 <br />8 <br />$125 <br />2,843 <br />Review change order <br />2 <br />8 <br />6 <br />$88 <br />2,3141 <br />JLA <br />$1,886 <br />1,886 <br />C& W <br />$1,500 <br />1,500 <br />5 CONSTRUCTION PHASE <br />Coordination/Observation - well <br />18 <br />100 <br />20 <br />54,493 <br />$758 <br />21,721 <br />Coordination/Observation - RWM <br />121 <br />80 <br />20 <br />$599 <br />13,619 <br />Shop Dw s <br />10 <br />30 <br />12 <br />$301 <br />6 853 <br />Meetings 8 <br />12 <br />24 <br />24 <br />$346 <br />7,8 <br />JLA onsite Drill #S-1 <br />4 <br />4 <br />4 <br />$40,358 <br />$78 <br />42,140 <br />JLA Well Cornpletion Report <br />$5,430 <br />$66 <br />5,496 <br />Startup & Operationaltestin wellhead FO <br />10 <br />4 <br />8 <br />30 <br />1 <br />$302 <br />6,872 <br />C&W <br />$6,000 <br />6,000 <br />Final FDEP Release <br />6 <br />4 <br />20 <br />$76 <br />3,946 <br />TOTALHOURS <br />136 <br />118 <br />548 <br />264 <br />$85,217 <br />$6,110 <br />222,511 <br />LABOR $/HOUR 235 <br />225 <br />150 <br />105 <br />961 <br />1 <br />SUBTOTAL <br />530,600 <br />S17,7001 <br />$57,5401 <br />$25,3441 <br />1 $131,184 <br />181 <br />K:\WPB_Civil\General\Black\Florida\IRCU\WelI S1R\IRCU Floridan Well S-1 Replacement WO Jill REV 1.4.22.docx Page 9 of 9 <br />$42,141 <br />$48,922 <br />$8,388 <br />$8,543 <br />$114,517 <br />$222,511 <br />