My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-106
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 12:16:25 PM
Creation date
6/20/2022 12:15:28 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/07/2022
Control Number
2022-106
Agenda Item Number
8.L.
Entity Name
Bowman Consulting Group, Ltd.
Subject
Work Order No. 3 to Amendment No. 2
for West Wabasso Septic to Sewer Phase 3B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowman <br />5/4/22 <br />Estimated Staff Loading For: <br />Indian River Co. Utilities - West Wabasso Septic to sewer Amendment 2 <br />TASK Sr Proj Mgr Sr Engr Proj Engr Engr Sr Dsgnr Clerical TOTAL <br />Task 1 - Design Services 0 <br />1. Phase 3B Redesign 4 4 10 4 10 2 34 <br />2. Phase 3A Redesign 4 4 8 4 6 2 28 <br />0 <br />0 <br />Staff By Category Totals 8 8 18 8 16 4 62 <br />Billing Rate ($/hr) $165 $150 $130 <br />$100 $105 $50 <br />Total Personnel Cost ($) $1,320 $1,200 $2,340 <br />$800 $1,680 $200 $7,540 <br />Staffing Ratio (% of total hrs 12.9 12.9 29.0 <br />12.9 25.8 6.5 <br />Average Personnel Cost ($/hr) <br />121.61 <br />Description of Other Project Costs VALUE ($) <br />Total of other costs ($) $0 <br />Total Estimated Project Cost () $7,540 <br />West Wabasso Fee Est 20220504.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.