Laserfiche WebLink
Gvhihit 1 - A-rimnnt 1 (Hinterland Grnunl <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price Bid <br />Revised Unit Price <br />Material <br />Installed Unit <br />Price Bid <br />Revised Unit <br />Price Install <br />Total Unit Price <br />(Material + <br />Installation) <br />Revised total Unit <br />Price (Material + <br />Installation) <br />SECTION A -UNIT COST/PRICES <br />Al <br />Mobilization <br />(a) <br />Emergency Event <br />1 <br />EA <br />$ <br />$ 2,500.00 <br />$ <br />2,841.25 <br />$ <br />2,500.001 <br />$2,841.25 <br />(b) <br />Non - Emergency Event <br />1 <br />EA <br />$ <br />$ 1,500.00 <br />$ <br />1,704.75 <br />$ <br />1,500.00 <br />$1,704.75 <br />A2 <br />Temporary Traffic Control <br />(a) Residential Street <br />1 <br />L.F. <br />$ <br />1.00 <br />$ <br />1.14 <br />$ 0.50 <br />$ <br />0.57 <br />$ <br />1.50 <br />$1.70 <br />(b) Arterial Roadway <br />1 <br />L.F. <br />$ <br />2.00 <br />$ <br />2.27 <br />$ 1.00 <br />$ <br />1.14 <br />$ <br />3.00 <br />$3.41 <br />(c) FDOT Roadway <br />1 <br />L.F. <br />$ <br />3.00 <br />$ <br />3.41 <br />$ 1.00 <br />$ <br />1.14 <br />$ <br />4.00 <br />$4.55 <br />A3 <br />Video Documentation <br />(a) <br />Pre -Construction <br />1 <br />L.F. <br />$ <br />1.00 <br />$ <br />1.14 <br />$ <br />$ <br />1.00 <br />$1.14 <br />(b) <br />Post -Construction Video <br />1 <br />L.F. <br />$ <br />1.00 <br />$ <br />1.14 <br />$ <br />$ <br />1.00 <br />$1.14 <br />A4 <br />Water Main - PVC <br />(a) 2 -inch <br />1 <br />L.F. <br />$ <br />2.00 <br />$ <br />2.27 <br />$ 10.00 <br />$ <br />11.37 <br />$ <br />12.00 <br />$13.64 <br />(b) 4 -inch <br />1 <br />L.F. <br />$ <br />3.00 <br />$ <br />3.41 <br />$ 10.00 <br />$ <br />11.37 <br />$ <br />13.00 <br />$14.77 <br />(c) 6 -inch <br />1 <br />L.F. <br />$ <br />5.00 <br />$ <br />5.68 <br />$ 12.00 <br />$ <br />13.64 <br />$ <br />17.00 <br />$19.32 <br />(d) 8 -inch <br />1 <br />L.F. <br />$ <br />9.00 <br />$ <br />10.23 <br />$ 14.00 <br />$ <br />15.91 <br />$ <br />23.00 <br />$26.14 <br />(e) 10 inch <br />1 <br />L.F. <br />$ <br />13.00 <br />$ <br />14.77 <br />$ 15.00 <br />$ <br />17.05 <br />$ <br />28.00 <br />$31.82 <br />(f) 12 inch <br />1 <br />L.F. <br />$ <br />18.00 <br />$ <br />20.46 <br />$ 18.00 <br />$ <br />20.46 <br />$ <br />36.00 <br />$40.91 <br />(g) 16 -inch <br />1 <br />L.F. <br />$ <br />34.00 <br />$ <br />38.64 <br />$ 22.00 <br />$ <br />25.00 <br />$ <br />56.00 <br />$63.64 <br />(h) 18 -inch <br />1 <br />L.F. <br />$ <br />41.00 <br />$ <br />46.60 <br />$ 26.00 <br />$ <br />29.55 <br />$ <br />67.00 <br />$76.15 <br />(i) 20 -inch <br />1 <br />L.F. <br />$ <br />50.00 <br />$ <br />56.83 <br />$ 30.00 <br />$ <br />34.10 <br />$ <br />80.00 <br />$90.92 <br />0) 24 -inch <br />1 <br />L.F. <br />$ <br />70.00 <br />$ <br />79.56 <br />$ 35.00 <br />$ <br />39.78 <br />$ <br />105.00 <br />$119.33 <br />AS <br />Water Main - DIP <br />Cement Lined Interior for Water Mains <br />(a) 4 -inch <br />1 <br />L.F. <br />$ <br />20.00 <br />$ <br />22.73 <br />$ 12.00 <br />$ <br />13.64 <br />$ <br />32.00 <br />$36.37 <br />(b) 6 inch <br />1 <br />L.F. <br />$ <br />16.00 <br />$ <br />18.18 <br />$ 13.00 <br />$ <br />14.77 <br />$ <br />29.00 <br />$32.96 <br />(c) 8 -inch <br />1 <br />L.F. <br />$ <br />22.00 <br />$ <br />25.00 <br />$ 14.00 <br />$ <br />15.91 <br />$ <br />36.00 <br />$40.91 <br />(d) 10 -inch <br />1 <br />L.F. <br />$ <br />30.00 <br />$ <br />34.10 <br />$ 16.00 <br />$ <br />18.18 <br />$ <br />46.00 <br />$52.28 <br />(e) 12 -inch <br />1 <br />L.F. <br />$ <br />38.00 <br />$ <br />43.19 <br />$ 18.00 <br />$ <br />20.46 <br />$ <br />56.00 <br />$63.64 <br />(f) 16 -inch <br />1 1 <br />L.F. <br />$ <br />55.00 <br />$ <br />62.51 <br />$ 25.00 <br />$ <br />28.41 <br />$ <br />80.00 <br />$90.92 <br />(g) 18 -inch <br />1 <br />L.F. <br />$ <br />62.00 <br />$ <br />70.46 <br />$ 32.00 <br />$ <br />36.37 <br />$ <br />94.00 <br />$106.83 <br />(h) 20 -inch <br />1 <br />L.F. <br />$ <br />72.00 <br />$ <br />81.83 <br />$ 35.00 <br />$ <br />39.78 <br />$ <br />107.00 <br />$121.61 <br />A6 <br />Sewer Pipe - DIP <br />Epoxy Lined Interior for Sewer Force Mains <br />(a) 4 -inch <br />1 <br />L.F. <br />$ <br />32.00 <br />$ <br />36.37 <br />$ 14.00 <br />$ <br />15.91 <br />$ <br />46.00 <br />$52.28 <br />(b) 6 inch <br />1 <br />L.F. <br />$ <br />28.00 <br />$ <br />31.82 <br />$ 14.00 <br />$ <br />15.91 <br />$ <br />42.00 <br />$47.73 <br />(c) 8 -inch <br />1 <br />L.F. <br />$ <br />30.00 <br />$ <br />34.10 <br />$ 15.00 <br />$ <br />17.05 <br />$ <br />45.00 <br />$51.14 <br />(d) 30 -inch <br />1 <br />L.F. <br />$ <br />38.00 <br />$ <br />43.19 <br />$ 18.00 <br />$ <br />20.46 <br />$ <br />56.00 <br />$63.64 <br />(e) 12 -inch <br />1 <br />L.F. <br />$ <br />58.00 <br />$ <br />65.92 <br />$ 20.00 <br />$ <br />22.73 <br />$ <br />78.00 <br />$88.65 <br />(f) 16 -inch <br />1 <br />L.F. <br />$ <br />80.00 <br />$ <br />90.92 <br />$ 28.00 <br />$ <br />31.82 <br />$ <br />108.00 <br />$122.74 <br />(g) 18 -inch <br />1 <br />L.F. <br />$ <br />94.00 <br />$ <br />106.83 <br />$ 34.00 <br />$ <br />38.64 <br />$ <br />128.00 <br />$145.47 <br />(h) 20 -inch <br />1 <br />L.F. <br />$ <br />102.00 <br />$ <br />115.92 <br />$ 38.00 <br />$ <br />43.19 <br />$ <br />140.00 <br />$159.11 <br />(i) 24 -inch <br />1 <br />L.F. <br />$ <br />130.00 <br />$ <br />147.75 <br />$ 45.00 <br />$ <br />51.14 <br />$ <br />175.00 <br />$198.89 <br />A7 <br />PVC Gravity Sewer - 8 inch <br />(a) 0'-6' <br />1 <br />LF. <br />$ <br />6.00 <br />$ <br />6.82 <br />$ 35.00 <br />$ <br />39.78 <br />$ <br />41.00 <br />$46.60 <br />(b) 6'-8' <br />1 <br />L.F. <br />$ <br />6.00 <br />$ <br />6.82 <br />$ 40.00 <br />$ <br />45.46 <br />$ <br />46.00 <br />$52.28 <br />(c) 8'-10' <br />1 <br />L.F. <br />$ <br />6.00 <br />$ <br />6.82 <br />$ 50.00 <br />$ <br />56.83 <br />$ <br />56.00 <br />$63.64 <br />(d) 10'-12' <br />1 <br />L.F. <br />$ <br />6.00 <br />$ <br />6.82 <br />$ 75.00 <br />$ <br />85.24 <br />$ <br />81.00 <br />$92.06 <br />(e) 12'-14' <br />1 <br />L.F. <br />$ <br />6.00 <br />$ <br />6.82 <br />$ 100.00 <br />$ <br />113.65 <br />$ <br />106.00 <br />$120.47 <br />(f) Cost Credit <br />1 <br />L.F. <br />NA <br />$ <br />- <br />A8 <br />PVC Gravity Sewer - 10 inch <br />(a) 0'-6' <br />1 <br />L.F. <br />$ <br />8.00 <br />$ <br />9.09 <br />$ 35.00 <br />$ <br />39.78 <br />$ <br />43.00 <br />$48.87 <br />(b) 6'-8' <br />1 <br />L.F. <br />$ <br />8.00 <br />$ <br />9.09 <br />$ 40.00 <br />$ <br />45.46 <br />$ <br />48.00 <br />$54.55 <br />(c) 8'40' <br />1 <br />L.F. <br />$ <br />8.00 <br />$ <br />9.09 <br />$ 50.00 <br />$ <br />56.83 <br />$ <br />58.00 <br />$65.92 <br />(d) 10'-12' <br />1 <br />L.F. <br />$ <br />8.00 <br />$ <br />9.09 <br />$ 75.00 <br />$ <br />85.24 <br />$ <br />83.00 <br />$94.33 <br />(e) 12'-14' <br />1 1 <br />1 L.F. <br />1 $ <br />8.001 <br />$ <br />9.09 <br />$ 100.00 <br />S <br />113.65 <br />$ <br />108.00 <br />$122.74 <br />lof9 <br />