Laserfiche WebLink
Exhibit 1 -Amendment 1 (Hinterland GrouuI <br />nem <br />No. <br />Description <br />Unit <br />Material Unit <br />Price Bid <br />Revised Unit Price <br />Material <br />Installed Unit <br />Price Bid <br />Revised Unit <br />Price Install <br />Total Unit Price <br />(Material + <br />Installation) <br />Revised total Unit <br />Price (Material+ <br />Installation) <br />A25 Sanitary Sewer Services <br />(constructed with new gravity sewer) <br />6' il <br />(a) 0'�(double) <br />1 <br />EA. <br />$ <br />650.00 <br />$ <br />738.73 <br />$ 800.00 <br />$ <br />909.20 <br />$ 1,450.00 <br />$1,647.93 <br />(b) 0' <br />1 <br />EA. <br />$ <br />700.00 <br />$ <br />795.55 <br />$ 800.00 <br />$ <br />909.20 <br />$ 1,500.00 <br />$1,704.75 <br />(c) 6' <br />1 <br />EA. <br />$ <br />650.00 <br />$ <br />738.73 <br />$ 800.00 <br />$ <br />909.20 <br />$ 1,450.00 <br />$1,647.93 <br />(d) 6' -Over (double) <br />1 <br />EA. <br />$ <br />700.00 <br />$ <br />795.55 <br />$ 800.00 <br />$ <br />909.20 <br />$ 1,500.00 <br />$1,704.75 <br />A26 6" Sanitary Sewer Services -Additional Footage <br />(a) 10'- 6' <br />1 <br />L. F. <br />$ <br />5.00 <br />$ <br />5.68 <br />$ 15.00 <br />$ <br />17.05 <br />$ 20.00 <br />$22.73 <br />(b) 6'- Over <br />1 <br />1 L.F <br />$ <br />7,00 <br />1 $ <br />7.96 <br />$ 15.00 <br />$ <br />17.05 <br />$ 22.00 <br />$25.00 <br />A27 Sanitary Sewer Services <br />(constructed on existing sewer lines - unlined) <br />(a) 0'-6' (single) <br />1 <br />EA. <br />$ <br />650.00 <br />$ <br />738.73 <br />$ 1,000.00 <br />$ <br />1,136.50 <br />$ 1,650.00 <br />$1,875.23 <br />(b) 0'-6' (double) <br />1 <br />EA. <br />$ <br />700.00 <br />$ <br />795.55 <br />$ 1,000.00 <br />$ <br />1,136.50 <br />$ 1,700.00 <br />$1,932.05 <br />(c) 6' -Over (single) <br />1 <br />EA. <br />$ <br />650.00 <br />$ <br />738.73 <br />$ 1,000.00 <br />$ <br />1,136.50 <br />$ 1,650.00 <br />$1,875.23 <br />(d) 6' -Over (double) <br />1 <br />EA. <br />$ <br />700.00 <br />$ <br />795.55 <br />$ 1,000.00 <br />$ <br />1,136.50 <br />$ 1,700.00 <br />$1,932.05 <br />A28 Sanitary Sewer Services <br />(constructed on existing sewer lines - lined) <br />(a) 0'-6' (single) <br />1 <br />EA. <br />$ <br />800.00 <br />$ <br />909.20 <br />$ 1,200.00 <br />$ <br />1,363.80 <br />$ 2,000.00 <br />$2,273.00 <br />(b) 0'-6' (double) <br />1 <br />EA. <br />$ <br />1,000.00 <br />$ <br />1,136.50 <br />$ 1,400.00 <br />$ <br />1,591.10 <br />$ 2,400.00 <br />$2,727.60 <br />(c) 6' -Over (single) <br />1 <br />EA. <br />$ <br />800.00 <br />$ <br />909.20 <br />$ 1,200.00 <br />$ <br />1,363.80 <br />$ 2,000.00 <br />$2,273.00 <br />(d) 6' -Over (double) <br />1 <br />EA. <br />$ <br />1,000.00 <br />$ <br />1,136.50 <br />$ 1,400.00 <br />$ <br />1,591.10 <br />$ 2,400.00 <br />$2,727.60 <br />A29 Sanitary Sewer Cleanouts <br />(to existing sanitary sewer laterals) <br />(a) 0'-6' (4") <br />1 <br />EA. <br />$ <br />300.00 <br />$ <br />340.95 <br />$ 500.00 <br />$ <br />568.25 <br />$ 800.00 <br />$909.2 <br />(b) 6' -Over (4") <br />1 <br />EA. <br />$ <br />400.00 <br />$ <br />454.60 <br />$ 800.00 <br />$ <br />909.20 <br />$ 1,200.00 <br />$1,363.80 <br />(c) 10'-6'(6') <br />1 <br />EA. <br />$ <br />350.00 <br />$ <br />397.78 <br />$ 500.00 <br />$ <br />568.25 <br />$ 850.00 <br />$966.03 <br />(d) 6' -Over (6") <br />1 <br />EA. <br />$ <br />450.00 <br />$ <br />511.43 <br />$ 800.00 <br />$ <br />909.20 <br />$ 1,250.00 <br />$1,420.63 <br />A30 Cleanout Ring and Cover <br />1 <br />EA. <br />$ <br />200.00 <br />$ <br />227.30 <br />$ 150.00 <br />$ <br />170.48 <br />$ 350.00 <br />$397.78 <br />(constructed on new or existing cleanouts) <br />A31 Water Services (on 6" or smaller main) <br />(constructed in conjunction with water main) <br />(a) 1" (single short) <br />1 <br />EA. <br />$ <br />250.00 <br />$ <br />284.13 <br />$ 400.00 <br />$ <br />454.60 <br />$ 650.00 <br />$738.73 <br />(b) 1" (single long) <br />1 <br />EA. <br />$ <br />290.00 <br />$ <br />329.59 <br />$ 500.00 <br />$ <br />568.25 <br />$ 790.00 <br />$897.84 <br />(c) 1" (double short) <br />1 <br />EA. <br />$ <br />310.00 <br />$ <br />352.32 <br />$ 500.00 <br />$ <br />568.25 <br />$ 810.00 <br />$920.57 <br />(d) 1" (double long) <br />1 <br />EA. <br />$ <br />350.00 <br />$ <br />397.78 <br />$ 700.00 <br />$ <br />795.55 <br />$ 1,050.00 <br />$1,193.33 <br />(e) 2" (single short) <br />1 <br />EA. <br />$ <br />790.00 <br />$ <br />897.84 <br />$ 600.00 <br />$ <br />681.90 <br />$ 1,390.00 <br />$1,579.74 <br />(f) 2" (single long) <br />1 <br />EA. <br />$ <br />875.00 <br />$ <br />994.44 <br />$ 700.001 <br />$ <br />795.55 <br />$ 1,575.00 <br />$1,789.99 <br />(g) 2" (double short) <br />1 <br />EA. <br />$ <br />1,600.00 <br />$ <br />1,818.40 <br />$ 700.00 <br />$ <br />795.55 <br />$ 2,300.00 <br />$2,613.95 <br />(h) 2" (double long) <br />1 <br />EA. <br />$ <br />1,600.00 <br />$ <br />1,818.40 <br />$ 900.00 <br />$ <br />1,022.85 <br />$ 2,500.00 <br />$2,841.25 <br />A32 lWater Services- Horizontally Drilled <br />(constructed in conjunction with 6" or smaller water main) <br />(a) 1" (single short) <br />1 <br />EA. <br />$ <br />275.00 <br />$ <br />312.54 <br />$ 1,200.00 <br />$ <br />1,363.80 <br />$ 1,475.00 <br />$1,676.34 <br />(b) 1" (single long) <br />1 <br />EA. <br />$ <br />290.00 <br />$ <br />329.59 <br />$ 1,200.00 <br />$ <br />1,363.80 <br />$ 1,490.00 <br />$1,693.39 <br />(c) 1" (double short) <br />1 <br />EA. <br />$ <br />550.00 <br />$ <br />625.08 <br />$ 1,200.00 <br />$ <br />1,363.80 <br />$ 1,750.00 <br />$1,988.88 <br />(d) 1" (double long) <br />1 <br />EA. <br />$ <br />550.00 <br />$ <br />625.08 <br />$ 1,200.00 <br />$ <br />1,363.80 <br />$ 1,750.00 <br />$1,988.88 <br />(e) 2" (single short) <br />1 <br />EA. <br />$ <br />2,400.00 <br />$ <br />2,727.60 <br />$ 1,200.00 <br />$ <br />1,363.80 <br />$ 3,600.00 <br />$4,091.40 <br />(f) 2" (single long) <br />1 <br />EA. <br />$ <br />2,400.00 <br />$ <br />2,727.60 <br />$ 1,200.00 <br />$ <br />1,363.80 <br />$ 3,600.00 <br />$4,091.40 <br />(g) 2" (double short) <br />1 <br />EA. <br />$ <br />2,000.00 <br />$ <br />2,273.00 <br />$ 1,200.00 <br />$ <br />1,363.80 <br />$ 3,200.00 <br />$3,636.80 <br />IN 2" (double long) <br />1 <br />EA. <br />$ <br />2,800.00 <br />$ <br />3,182.201 <br />$ 1,200.00 <br />$ <br />1,363.80 <br />$ 4,000.00 <br />$4,546.00 <br />A33 lWater Services (on 6" or smaller main) <br />(constructed on existing water main) <br />(a) 1" (single short) <br />1 <br />EA. <br />$ <br />250.00 <br />$ <br />284.13 <br />$ 1,400.00 <br />$ <br />1,591.10 <br />$ 1,650.00 <br />$1,875.23 <br />(b) 1" (single long) <br />(c) 1" (double short) <br />(d) 1" (double long) <br />(e) 2" (single short) <br />(f) 2" (single long) <br />(g) 2" (double short) <br />1 <br />I <br />1 <br />1 <br />1 <br />1 <br />EA. <br />EA. <br />EA. <br />EA. <br />EA. <br />EA <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />275.00 <br />500.00 <br />600.00 <br />1,200.00 <br />1,300.00 <br />1,700.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />312.54 <br />568.25 <br />681.90 <br />1,363.80 <br />1,477.45 <br />1,932.05 <br />$ 1,800.00 <br />$ 1,600.00 <br />$ 1,800.001 <br />$ 1,800.00 <br />$ 1,800.00 <br />$ 1,800.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />2,045.70 <br />1,818.40 <br />2,045.70 <br />2,045.70 <br />2,045.70 <br />2,045.70 <br />$ 2,075.001 <br />$ 2,100.00 <br />$ 2,400.00 <br />$ 3,000.00 <br />$ 3,100.00 <br />$ 3,500.00 <br />$2,358.24 <br />$2,386.65 <br />$2,727.60 <br />$3,409.50 <br />$3,523.15 <br />$3,977.75 <br />12 of 17 <br />