Laserfiche WebLink
Exhibit 1- Amendment 1 (Hinterland Grouol <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price Bid <br />Revised Unit Price <br />Material <br />Installed Unit <br />Price Bid <br />Revised Unit <br />Price Install <br />Total Unit Price <br />(Material + <br />Installation) <br />Revised total Unit <br />Price (Material+ <br />Installation) <br />C3 <br />Horizontally Directional Drilled -PVC Driveway Bores <br />20 -foot length <br />(a) 4 -inch <br />1 <br />EA. <br />$ <br />2,500.00 <br />$ 2,841.25 <br />$ <br />500.00 <br />$ <br />568.25 <br />$ <br />3,000.00 <br />$3,409.50 <br />(b) 6 -inch <br />1 <br />EA. <br />$ <br />3,500.00 <br />$ 3,977.75 <br />$ <br />500.00 <br />$ <br />568.25 <br />$ <br />4,000.00 <br />$4,546.00 <br />c) 8 -inch <br />1 <br />EA. <br />$ <br />4,500.00 <br />$ 5,114.25 <br />$ <br />500.00 <br />$ <br />568.25 <br />$ <br />5,000.00 <br />$5,682.5 <br />(d) 12 -inch <br />1 <br />EA. <br />$ <br />5,000.00 <br />$ 5,682.50 <br />$ <br />500.00 <br />$ <br />568.25 <br />$ <br />5,500.00 <br />$6,250.75 <br />40 -foot length <br />(a) 4 -inch <br />1 <br />EA. <br />$ <br />3,500.00 <br />$ 3,977.75 <br />$ <br />500.00 <br />$ <br />568.25 <br />$ <br />4,000.00 <br />$4,546.00 <br />(b) 6 -inch <br />1 <br />EA. <br />$ <br />4,500.00 <br />$ 5,114.25 <br />$ <br />500.00 <br />$ <br />568.25 <br />$ <br />5,000.00 <br />$5,682.50 <br />(c) 8 -inch <br />1 <br />EA. <br />$ <br />5,000.00 <br />$ 5,682.50 <br />$ <br />500.00 <br />$ <br />568,25 <br />$ <br />5,500.00 <br />$6,250.75 <br />(d) 12 -inch <br />1 <br />EA. <br />$ <br />5,500.00 <br />$ 6,250.75 <br />$ <br />500.00 <br />$ <br />568.25 <br />$ <br />6,000.00 <br />$6,819.00 <br />60 -foot length <br />(a) 4 -inch <br />1 <br />EA. <br />$ <br />4,000.00 <br />$ 4,546.00 <br />$ <br />750.00 <br />$ <br />852.38 <br />$ <br />4,750.00 <br />$5,398.38 <br />6-inch <br />1 <br />EA. <br />$ <br />5,000.00 <br />$ 5,682.50 <br />$ <br />750.00 <br />$ <br />852.38 <br />$ <br />5,750.00 <br />$6,534.88 <br />8 -inch <br />rd) <br />1 <br />EA. <br />$ <br />5,500.00 <br />$ 6,250.75 <br />$ <br />750.00 <br />$ <br />852.38 <br />$ <br />6,250.00 <br />$7,103.13 <br />12 -inch <br />1 <br />EA. <br />$ <br />6,000.00 <br />$ 6 819.00 <br />$ <br />750.00 <br />$ <br />852.38 <br />$ <br />61750.00 <br />$7,671.38 <br />SECTION D: Time and Materials Rates (TO BE USED ON T&M ORDERS ONLY) <br />Dl <br />Equipment Hourly Rates <br />(a) Trackhoe (specify model) <br />(medium) <br />1 <br />Hr. <br />NA <br />$ <br />75.00 <br />$ <br />85.24 <br />$ <br />75.00 <br />$85.24 <br />(large) <br />1 <br />Hr. <br />NA <br />$ <br />125.00 <br />$ <br />142.06 <br />$ <br />125.00 <br />$142.06 <br />(b) Combination Backhoe <br />1 <br />Hr. <br />NA <br />$ <br />65.00 <br />$ <br />73.87 <br />$ <br />65.00 <br />$73.87 <br />(c) Front end Loader <br />1 <br />Hr. <br />NA <br />$ <br />85.00 <br />$ <br />96.60 <br />$ <br />85.00 <br />$96.60 <br />(d) Grader <br />1 <br />Hr. <br />NA <br />$ <br />120.00 <br />$ <br />136.38 <br />$ <br />120.00 <br />$136.38 <br />(e) Dump Truck ( 9 C.Y.) <br />1 <br />Hr. <br />NA <br />$ <br />85.00 <br />$ <br />96.60 <br />$ <br />85.00 <br />$96.60 <br />(f) Tandem Dump Truck (18 C.Y.) <br />1 <br />Hr. <br />NA <br />$ <br />85.00 <br />$ <br />96.60 <br />$ <br />85.00 <br />$96.60 <br />(g) Forklift <br />1 <br />Hr. <br />NA <br />$ <br />50.00 <br />$ <br />56.83 <br />$ <br />50.00 <br />$56.83 <br />(h) Crew Truck with hand tools <br />1 <br />Hr. <br />NA <br />$ <br />25.00 <br />$ <br />28.41 <br />$ <br />25.00 <br />$28.41 <br />(i) Trash Pump 3" <br />1 <br />Hr. <br />NA <br />$ <br />15.00 <br />$ <br />17.05 <br />$ <br />15.00 <br />$17.05 <br />(j) Trash Pump 2" <br />1 <br />Hr. <br />NA <br />$ <br />10.00 <br />$ <br />11,37 <br />$ <br />10.00 <br />$11.37 <br />(k) Walk behind Vibrating Roiler <br />1 <br />Hr. <br />NA <br />$ <br />20.00 <br />$ <br />22.73 <br />$ <br />20.00 <br />$22.73 <br />(1) Rev. Plate Compactor <br />1 <br />Hr. <br />NA <br />$ <br />30.00 <br />$ <br />34.10 <br />$ <br />30.00 <br />$34.10 <br />(m) Jumping Jack <br />1 <br />Hr, <br />NA <br />$ <br />10.00 <br />$ <br />11.37 <br />$ <br />10.00 <br />$11.37 <br />(n) Cut off saw (14") <br />1 <br />Hr. <br />NA <br />$ <br />5.00 <br />$ <br />5.68 <br />$ <br />5.00 <br />$5.68 <br />(o) Street saw (14") <br />1 <br />Hr. <br />NA <br />$ <br />5.00 <br />$ <br />5.68 <br />$ <br />5.00 <br />$5.68 <br />(p) Gradall <br />1 <br />Hr. <br />NA <br />$ <br />120.00 <br />$ <br />136.38 <br />$ <br />120.00 <br />$136.38 <br />(q) Roller <br />1 <br />Hr. <br />NA <br />$ <br />85.00 <br />$ <br />96.60 <br />$ <br />85.00 <br />$96.60 <br />(r) Welding Truck <br />1 <br />Hr. <br />NA <br />$ <br />85.00 <br />$ <br />96.60 <br />$ <br />85.00 <br />$96.60 <br />(s) 1welder <br />1 <br />Hr. <br />NA <br />$ <br />85.00 1 <br />$ <br />96.60 <br />$ <br />85.00 <br />$96.60 <br />(t) ICement Mixer <br />1 <br />Hr. <br />NA <br />$ <br />15.00 <br />$ <br />17.05 <br />$ <br />15.00 <br />$17.05 <br />(u) jBox Blade <br />1 <br />Hr. <br />NA <br />$ <br />50.00 <br />$ <br />56.83 <br />$ <br />50.00 <br />$56.83 <br />(v) Water Truck <br />1 <br />Hr. <br />NA <br />$ <br />120.00 <br />$ <br />136.38 <br />$ <br />120.00 <br />$136.38 <br />(w) 11000 gpm sump pump <br />1 <br />Hr. <br />NA <br />$ <br />25.00 <br />$ <br />28.41 <br />$ <br />25.00 <br />$28.41 <br />D2 <br />Crew Hourly Rates <br />(a) jCrew Man <br />1 <br />Hr. <br />NA <br />$ <br />45.00 <br />$ <br />51.14 <br />$ <br />45.00 <br />$51.14 <br />(b) IForeman <br />1 <br />Hr. <br />NA <br />$ <br />75.00 <br />$ <br />85.24 <br />$ <br />75.00 <br />$85.24 <br />(c) ISupervisor <br />I <br />Hr. <br />NA <br />$ <br />100.00 <br />$ <br />113.65 <br />$ <br />100.00 <br />$113.65 <br />(d) 3 man crewincludes 1 supervisor <br />1 <br />Hr. <br />NA <br />$ <br />285.00 <br />$ <br />323.90 <br />$ <br />285.00 <br />$323.90 <br />(e) 4 man crew includes 1 supervisor <br />1 <br />Hr. <br />NA <br />$ <br />325.00 <br />$ <br />369.36 <br />$ <br />325.00 <br />$369.36 <br />(f) 15 man crew includes 1 supervisor <br />1 <br />Hr. <br />NA <br />$ <br />400.00 <br />$ <br />454.60 <br />$ <br />400.00 <br />$454.60 <br />D3 <br />Overtime Crew Hourly Rates <br />(a) lCrew Man <br />1 <br />Hr. <br />NA <br />$ <br />67.50 <br />$ <br />76.71 <br />$ <br />67.50 <br />$76.71 <br />(b) IForeman <br />1 <br />Hr. <br />NA <br />$ <br />112.50 <br />$ <br />127.86 <br />$ <br />112.50 <br />$127.86 <br />(c) ISupervisor <br />1 <br />Hr. <br />NA <br />$ <br />150.00 <br />$ <br />170.48 <br />$ <br />150.00 <br />$170,48 <br />(d) 13 man crew includes 1 supervisor <br />1 <br />Hr. <br />NA <br />$ <br />427.50 <br />$ <br />485.85 <br />$ <br />427.50 <br />$485.85 <br />(e) 14 man crew includes 1 supervisor <br />1 <br />Hr. <br />NA-$ <br />487.50 <br />$ <br />554.04 <br />$ <br />487.50 <br />$554.04 <br />(f) 5 man crew includes 1 supe;7--11 <br />I <br />Hr. <br />NA <br />$ <br />600.00 <br />$ <br />681.90 <br />$ <br />600.00 <br />$681.90 <br />D4 <br />Nightime Crew Hourly Rates <br />(a) Crew Man <br />(b) IForeman <br />(c) Supervisor <br />1 <br />1 <br />1 <br />Hr. <br />Hr. <br />Hr. <br />NA <br />NA <br />NA <br />$ <br />$ <br />$ <br />90.00 <br />150.00 <br />200.00 <br />$ <br />$ <br />$ <br />102,29 <br />170.48 <br />227.30 <br />$ <br />$ <br />$ <br />90.00 <br />150.00 <br />200.00 <br />$102.29 <br />$170.48 <br />T $227.30 <br />16 of 17 <br />