Laserfiche WebLink
Exhibit 1 -Amendment 1 (CK Contractors & Development) <br />Item <br />No. <br />I <br />Description <br />Quantity <br />Unit <br />I Material Unit <br />Price Bid <br />Revised Unit <br />Price Material <br />Installed Unit <br />Price Bid <br />Revised Unit <br />Price Install <br />Total Unit Price <br />(Material + <br />Installation) <br />Revised total unit <br />Price (Material + <br />Installation) <br />SECTION A - UNIT COST/PRICES <br />Al <br />Mobilization <br />(a) <br />Emergency Event <br />1 <br />EA <br />$ - <br />$ <br />2,500.00 <br />$ <br />2,841.25 <br />$ <br />2,500.00 <br />$2,841.25 <br />(b) INon <br />- Emergency Event <br />1 <br />EA <br />$ <br />$ <br />1,500.00 <br />$ <br />1,704.75 <br />$ <br />1,500.00 <br />$1,704.75 <br />A2 <br />Temporary Traffic Control <br />(a) Residential Street <br />1 <br />L.F. <br />$ - <br />$ <br />0.75 <br />$ <br />0.85 <br />$ <br />0.75 <br />$0.85 <br />(b) Arterial Roadway <br />1 <br />L.F. <br />$ - <br />$ <br />1.15 <br />$ <br />1.31 <br />$ <br />1.15 <br />$1.31 <br />(c) FDOTRoadway <br />1 <br />L.F. <br />$ - <br />$ <br />1.15 <br />$ <br />1.31 <br />$ <br />1.15 <br />$1.31 <br />A3 <br />Video Documentation <br />(a) Pre -Construction <br />1 <br />L.F. <br />$ - <br />$ <br />0.60 <br />$ <br />0.68 <br />$ <br />0.60 <br />$0.68 <br />(b) Post -Construction Video <br />1 <br />L.F. <br />$ <br />$ <br />0.60 <br />$ <br />0.68 <br />$ <br />0.60 <br />$0.68 <br />A4 <br />Water Main - PVC <br />(a) 2 -inch <br />1 <br />L.F. <br />$ 1.01 <br />$ 1.15 <br />$ <br />14.46 <br />$ <br />16.43 <br />$ <br />15.47 <br />$17.58 <br />(b) 44nch <br />1 <br />L.F. <br />$ 2.87 <br />$ 3.27 <br />$ <br />15.79 <br />$ <br />17.95 <br />$ <br />18.67 <br />$21.21 <br />(c) 6 -inch <br />1 <br />L.F. <br />$ 5.42 <br />$ 6.16 <br />$ <br />19.47 <br />$ <br />22.12 <br />$ <br />24.88 <br />$28.28 <br />(d) 8 -inch <br />1 <br />L.F. <br />$ 9.27 <br />$ 10.54 <br />$ <br />22.08 <br />$ <br />25.09 <br />$ <br />31.35 <br />$35.62 <br />(e) 10 inch <br />1 <br />L.F. <br />$ 13.73 <br />$ 15.60 <br />$ <br />25.57 <br />$ <br />29.06 <br />$ <br />39.30 <br />$44.66 <br />(f) 12 inch <br />1 <br />L.F. <br />$ 1930 <br />$ 21.94 <br />$ <br />30.46 <br />$ <br />34.62 <br />$ <br />49.77 <br />$56.56 <br />(g) 16 -inch <br />1 <br />L.F. <br />$ 27.71 <br />$ 31.49 <br />$ <br />47.51 <br />$ <br />53.99 <br />$ <br />75.21 <br />$85.48 <br />(h) 18 -inch <br />1 <br />L.F. <br />$ 40.90 <br />$ 46.48 <br />$ <br />50.03 <br />$ <br />56.86 <br />$ <br />90.93 <br />$103.3 <br />(i) 20 -inch <br />1 <br />L.F. <br />$ 49.06 <br />$ 55.76 <br />$ <br />59.81 <br />$ <br />67.97 <br />$ <br />108.87 <br />$123.73 <br />(j) 24 -inch <br />1 <br />L.F. <br />$ 70.66 <br />$ 80.30 <br />$ <br />74.48 <br />$ <br />84.65 <br />$ <br />145.14 <br />$164.95 <br />AS <br />Water Main - DIP <br />Cement Lined Interior for Water Mains <br />(a) 4 -inch <br />1 <br />L.F. <br />$ 22.55 <br />$ 25.62 <br />$ <br />15.79 <br />$ <br />17.95 <br />5 <br />38.34 <br />$43.57 <br />(b) 6inch <br />1 <br />L.F. <br />$ 16.82 <br />$ 19.12 <br />$ <br />19.47 <br />$ <br />22.12 <br />$ <br />36.29 <br />$41.2 <br />(c) 8 -inch <br />1 <br />L.F. <br />$ 22.99 <br />$ 26.13 <br />$ <br />22.08 <br />$ <br />25.09 <br />$ <br />45.06 <br />$51.22 <br />(d) 10 -inch <br />1 <br />L.F. <br />$ 25.91 <br />$ 29.45 <br />$ <br />25.57 <br />$ <br />29.06 <br />S <br />51.48 <br />$58.51 <br />(e) 12 -inch <br />1 <br />L.F. <br />$ 33.19 <br />$ 37.72 <br />$ <br />30.46 <br />$ <br />34.62 <br />$ <br />63.65 <br />$72.34 <br />(f) 16 -inch <br />1 <br />L.F. <br />$ 59.85 <br />$ 68.02 <br />$ <br />47.52 <br />$ <br />54.01 <br />$ <br />10737 <br />$122.03 <br />{g) 18 -inch <br />1 <br />L.F. <br />$ 70.77 <br />$ 80.43 <br />$ <br />51.40 <br />$ <br />58.41 <br />$ <br />122.17 <br />$138.8 <br />(h) 20 -inch <br />1 <br />L.F. <br />$ 83.00 <br />$ 94.33 <br />$ <br />61.44 <br />$ <br />69.83 <br />$ <br />144.44 <br />$164.16 <br />A6 <br />Sewer Pipe - DIP <br />Epoxy Lined Interior for Sewer Force Mains <br />(a) 4 -inch <br />1 <br />L.F. <br />$ 34.83 <br />$ 39.59 <br />$ <br />18.09 <br />$ <br />2056 <br />$ <br />52.92 <br />$60.15 <br />(b) 16inch <br />1 <br />L.F. <br />$ 31.43 <br />$ 35.71 <br />$ <br />22.33 <br />$ <br />25.38 <br />$ <br />53.76 <br />$61.10 <br />(c) 8 -inch <br />1 <br />L.F. <br />$ 36.33 <br />$ 41.29 <br />$ <br />25.37 <br />$ <br />28.83 <br />$ <br />61.70 <br />$70.12 <br />(d) 10 -inch <br />1 <br />L.F. <br />$ 45.31 <br />$ 51.49 <br />$ <br />29.41 <br />$ <br />33.43 <br />$ <br />74.72 <br />$84.92 <br />(e) 12 -inch <br />1 <br />L.F. <br />$ 55.01 <br />$ 62.52 <br />$ <br />35.07 <br />$ <br />39.85 <br />$ <br />90.08 <br />$102.38 <br />(f) 16 -inch <br />1 <br />L.F. <br />$ 80.74 <br />$ 91.76 <br />$ <br />53.35 <br />$ <br />60.63 <br />$ <br />134.09 <br />$152.39 <br />(g) 18 -inch <br />1 <br />L.F. <br />$ 110.28 <br />$ 125.34 <br />$ <br />57.69 <br />$ <br />65.57 <br />$ <br />167.97 <br />$190.90 <br />(h) 20 -inch <br />1 <br />L.F. <br />$ 122.51 <br />$ 139.23 <br />$ <br />69.01 <br />$ <br />78.43 <br />$ <br />191.52 <br />$217.67 <br />(i) 24 -inch <br />1 <br />L.F. <br />$ 161.14 <br />$ 183.14 <br />$ <br />85.98 <br />$ <br />97.72 <br />$ <br />247.13 <br />$280.86 <br />A7 <br />PVC Gravity Sewer - 8 inch <br />(a) 0'-6' <br />1 <br />L.F. <br />$ 5.51 <br />$ 6.26 <br />$ <br />18.65 <br />$ <br />21.19 <br />$ <br />24.16 <br />$27.46 <br />(b) 6-8' <br />1 <br />L.F. <br />$ 5.51 <br />$ 6.26 <br />$ <br />20.20 <br />$ <br />22.96 <br />$ <br />25.72 <br />$29.23 <br />(c) 8'-10' <br />1 <br />L.F. <br />$ 5.51 <br />$ 6.26 <br />$ <br />22.04 <br />$ <br />25.05 <br />$ <br />27.55 <br />$31.31 <br />(d) 10'-12' <br />1 <br />L.F. <br />$ 5.51 <br />$ 6.26 <br />$ <br />26.94 <br />$ <br />30.61 <br />$ <br />32.45 <br />$36.88 <br />(e) 12'-14' <br />1 <br />L.F. <br />$ 5.51 <br />$ 6.26 <br />$ <br />38.24 <br />$ <br />43.461 <br />$ <br />43.75 <br />$49.72 <br />(f) lCost Credit <br />1 <br />L.F. <br />NA <br />$ <br />0.10 <br />$ <br />0.11 <br />$0.10 <br />$0.11 <br />AS <br />PVC Gravity Sewer - 10 inch <br />(a) 0'-6' <br />1 <br />L.F. <br />$ 8.91 <br />$ 10.13 <br />$ <br />18.65 <br />$ <br />21.19 <br />$ <br />27.56 <br />$31.32 <br />6-8 <br />1 <br />L.F. <br />$ 8.91 <br />$ 10.13 <br />$ <br />20.20 <br />$ <br />22.96 <br />$ <br />29.11 <br />$33.09 <br />(c) 8'-10' <br />1 <br />L.F. <br />$ 8.91 <br />$ 10.13 <br />$ <br />22.04 <br />$ <br />25.05 <br />$ <br />30.95 <br />$35.18 <br />[(b) <br />(d) 10'-12' <br />1 <br />L.F. <br />$ 8.91 <br />$ 10.13 <br />$ <br />26.94 <br />$ <br />30.61 <br />$ <br />35.85 <br />$40.7 <br />(e) 12'-14' <br />1 <br />L.F. <br />$ 8.91 <br />$ 10.13 <br />$ <br />38.24 <br />$ <br />43.46 <br />$ <br />47.15 <br />$53.58 <br />(f) Cost Credit <br />1 <br />L.F. <br />NA <br />$ <br />0.10 <br />$ <br />0.11 <br />$ <br />0.10 <br />$0.11 <br />A9 <br />Connect to Existing Pipe (<12") <br />1 <br />EA <br />EA <br />$ 385.74 <br />$ 1,30038 <br />$ 438.39 <br />$1,477.88 <br />$ <br />5 <br />1,467.20 <br />1,508.17 <br />$ <br />$ <br />1,667.47 <br />1,714.03 <br />$ <br />$ <br />1,852.941 <br />2,808.54 <br />$2,105.86 <br />$3,191.91 <br />1 of 17 <br />