My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1973-076
CBCC
>
Resolutions
>
1970'S
>
1973
>
1973-076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 12:17:59 PM
Creation date
6/28/2022 11:34:59 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1973-076
Approved Date
12/05/1973
Resolution Type
Franchise
Subject
Sewer and Water Franchise
Breezy Village, Ltd.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ob <br />dD <br />jj SECTION XVII <br />+{, Should the Company desire to establish sewer rates and <br />I) charges or should the Company desire to increase any charges <br />i� <br />�I heretofore established and approved by the Board, then the <br />Company shall notify the Board in writing, setting forth the <br />schedule of rates and charges which it proposes. A public <br />�i <br />ii hearing 'shall then be held on such request, of which notice shall <br />i� <br />i' <br />l be given by publication in a newspaper regularly published in <br />said County at least one time not more than one month nor less <br />than one week preceding such hearing. Certified proof of <br />publication of such notice shall be filed with the Board. Said <br />hearing may thereafter be continued from time to time as <br />determined by the Board. If the Board enters an order pursuant <br />to such hearing and the Company or any person feels aggrieved <br />by such order, then the Company or such person may seek review <br />of the Board's action by proceeding in the Circuit Court of <br />the County. <br />SECTION XVIII <br />Prior to the Company placing any of its facilities in <br />any of the public places as herein authorized, the Company shall <br />make application to and obtain a permit from the County Engineer <br />authorizing said construction in the same manner as permits are <br />authorized in the County for the use of the public roads as shall <br />now or hereafter be established by regulations of the County. <br />The County shall have the right when special circumstances exist <br />to determine the time in which such construction shall be done. <br />SECTION XIX <br />If the Company fails or refuses to promptly and faithfully <br />keep, perform and abide by each and all of the terms and conditions <br />of this franchise, then the Board shall give the Company written <br />notice of such deficiencies or defaults and a reasonable time <br />within which the Company shall remedy the same, which notice <br />shall specify the deficiency or default. If the Company fails <br />13. <br />
The URL can be used to link to this page
Your browser does not support the video tag.