My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1974-038
CBCC
>
Resolutions
>
1970'S
>
1974
>
1974-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 1:06:08 PM
Creation date
6/28/2022 2:46:20 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1974-000
Approved Date
01/01/1974
Resolution Type
Establishing schedule of fees for Gas Code
Subject
Establishing schedule of fees for Gas Code
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />0 <br />RESOLUTION No. -Z4---4a- <br />WHEREAS, This Board passed an Electrical Code, and <br />WHEREAS, said Code provides that this Board establish a <br />Schedule of Fees for permits issued under said Code, <br />NOW, THEREFORE, BE IT RESOLVED By the Board of County <br />Commissioners of Indian River County, Florida, that when application <br />for a permit is approved and before a permit is issued, a fee therefore <br />shall be paid based on the following schedule of rates: <br />ELECTRICAL PERMIT FEE <br />SCHEDULE <br />1.00 <br />LIGHT OUTLETS <br />$ <br />3.00 <br />1 to 8 outlets, inclusive - minimum <br />3.00 <br />Over 8 outlets, the -minimum charge of <br />$3.00 for the first 8 outlets plus <br />1.00 <br />each additional outlet <br />.10 <br />SERVICES <br />.25 <br />Temporary for construction <br />2.50 <br />100 ampere and under <br />2.00 <br />Over 100 ampere to 200 ampere <br />3.00 <br />Over 200 ampere to 400 ampere <br />4.00 <br />Over 400 ampere to 600 ampere <br />5.00 <br />Over 600 ampere to 800 ampere <br />6.00 <br />For each additional 100 ampere (over <br />800 ampere) <br />1.00 <br />SERVICE CHANGES <br />100 ampere and under <br />3.00 <br />Over 100 ampere to 200 ampere <br />4.00 <br />Over 200 ampere to -400 ampere <br />5.00 <br />Over 400 ampere -each additional 100 <br />ampere <br />.50 <br />SWITCHBOARDS OR PANELS <br />By amperes, sameā¢as "Services" <br />EQUIPMENT <br />Drop in range <br />1.50 <br />Range top <br />1.00 <br />Oven <br />1.00 <br />Sign outlet <br />1.00 <br />and all other appliance outlets inspected <br />in conjunction with rough airing, inclu- <br />ding room space heaters, ceiling heat, <br />etc. - each <br />1.00 <br />MOTORS <br />Up to 1 H.P. <br />1.00 <br />1 to 3 H.P. <br />2.00 <br />3 to 5 N.P. <br />3.00 <br />Over 5 H.P. up to 10 H.P. - per additional <br />H.P. <br />1.00 <br />10 H.P. <br />8.00 <br />Over 10 H.P. - per additional H.P. <br />.25 <br />MACH I N- S <br />X -Ray - Portable, dentist <br />1.00 <br />X -Ray - Stationary, doctor <br />5.00 <br />Diathermic and Electronic outlet <br />1.00 <br />GENEP,i;TORS AND TRXIISFO'i-IERS <br />Each up to 5 KVA <br />2.00 <br />Each generator or transformer over <br />5 KVA through 10 KVA <br />4.00 <br />-Each generator or transform over <br />10 KVA through 15 I'M <br />6.00 <br />Each, garerator or transfonu!r oder <br />15 i'i'i+ thro' "01 ?0 KIM <br />15.07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.