My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1974-037
CBCC
>
Resolutions
>
1970'S
>
1974
>
1974-037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 1:05:11 PM
Creation date
7/1/2022 3:28:48 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1974-037
Approved Date
05/22/1974
Resolution Type
Establishing a schedule for fees for Plumbing Code
Subject
Establishing a schedule for fees for Plumbing Code
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOCKS <br />20 feet 5. 00 <br />Over 20 feet - each additional <br />10 feet 1.00 <br />® DEMOLITION <br />500 square feet minimum 4.00 <br />500 to 1, 000 square feet 10.00 <br />Over 1, 000 square feet - per <br />thousand square feet 2. 00 <br />FENCES 5. 00 <br />ELEVATORS -(For each elevator) - three <br />stories or less 10. 00 <br />Each additional floor over three <br />stories - per floor 3. 00 <br />SWIMMING POOLS <br />Up to 20, 000 gallons 20. 00 <br />Each 1, 000 gallons in excess 1.00 <br />ROOFS <br />First 100 square feet exempt <br />100 to 1, 000 square feet 5.00 <br />1, 000 to 2, 000 square feet 9.00 <br />Over 2, 000 sq. ft. - per thousand <br />thereafter 2.00 <br />ALL PAVING IN CONNECTION WITH <br />RESIDENTIAL OR COMMERCIAL WORK <br />First 1, 000 square feet 5.00 <br />Each 1, 000 square feet or fraction <br />thereof up to 10, 000 square feet 2.00 <br />Each 1, 000 square feet over 10, 000 <br />square feet 1.00 <br />The said fees shall include payment for the permit and for inspection <br />of the work, after the same shall have been completed. If the Building <br />Inspector shall, upon his inspection after completion of the work or <br />apparatus, find that the same does not conform to and comply with the <br />provisions of this chapter, he shall notify the Contractor or Owner, <br />indicating the corrections required; and when he shall be notified that <br />the corrections have been made, he shall again inspect the work or <br />apparatus without further charge; but when extra inspection Lrips are <br />necessary, due to any one of the following reasons, a charge of $5. 00 <br />shall be made for each trip: <br />(a) wrong address; <br />(b) condemned work, resulting from faulty construction; <br />(c) repairs or corrections not made when inspection is <br />called; <br />(d) work not ready for inspection when called; <br />(e) approved plans are not on job site. <br />The payment for re -inspection fees shall be made before any further <br />permits will be issued to the person owing same. <br />
The URL can be used to link to this page
Your browser does not support the video tag.