Laserfiche WebLink
8.11 Evidence of Financial Arrangements <br />A. If and to the extent OWNER has agreed to <br />furnish CONTRACTOR reasonable evidence that <br />financial arrangements have been made to satisfy <br />OWNER's obligations under the Contract Documents, <br />OWNER's responsibility in respect thereof will be as <br />set forth in the Supplementary Conditions. <br />ARTICLE 9 - ENGINEER'S STATUS DURING <br />CONSTRUCTION <br />9.01 OWNER'S Representative <br />A. ENGINEER will be OWNER's representative <br />during the construction period. The duties and <br />responsibilities and the limitations of authority of <br />ENGINEER as OWNER's representative during <br />construction are set forth in the Contract Documents <br />and will not be changed without written consent of <br />OWNER and ENGINEER. <br />9.02 Visits to Site <br />A. ENGINEER will make visits to the Site at <br />intervals appropriate to the various stages of construc- <br />tion as ENGINEER deems necessary in order to <br />observe as an experienced and qualified design <br />professional the progress that has been made and the <br />quality of the various aspects of CONTRACTOR's <br />executed Work. Based on information obtained <br />during such visits and observations, ENGINEER, for <br />the benefit of OWNER, will determine, in general, if <br />the Work is proceeding in accordance with the Con- <br />tract Documents. ENGINEER will not be required to <br />make exhaustive or continuous inspections on the Site <br />to check the quality or quantity of the Work. <br />ENGINEER's efforts will be directed toward providing <br />for OWNER a greater degree of confidence that the <br />completed Work will conform generally to the Contract <br />Documents. On the basis of such visits and <br />observations, ENGINEER will keep OWNER informed <br />of the progress of the Work and will endeavor to guard <br />OWNER against defective Work. <br />B. ENGINEER's visits and observations are <br />subject to all the limitations on ENGINEER's authority <br />and responsibility set forth in paragraph 9.10, and <br />particularly, but without limitation, during or as a result <br />of ENGINEER's visits or observations of <br />CONTRACTOR's Work ENGINEER will not <br />supervise, direct, control, or have authority over or be <br />responsible for CONTRACTOR's means, methods, <br />techniques, sequences, or procedures of construction, <br />or the safety precautions and programs incident <br />thereto, or for any failure of CONTRACTOR to comply <br />with Laws and Regulations applicable to the <br />performance of the Work. <br />9.03 Project Representative <br />A. If OWNER and ENGINEER agree, ENGI- <br />NEER will furnish a Resident Project Representative <br />to assist ENGINEER in providing more extensive <br />observation of the Work. The responsibilities and <br />authority and limitations thereon of any such Resident <br />Project Representative and assistants will be as <br />provided in paragraph 9.10 and in the Supplementary <br />Conditions. If OWNER designates another represen- <br />tative or agent to represent OWNER at the Site who is <br />not ENGINEER's Consultant, agent or employee, the <br />responsibilities and authority and limitations thereon of <br />such other individual or entity will be as provided in the <br />Supplementary Conditions. <br />9.04 Clarifications and Interpretations <br />A. ENGINEER will issue with reasonable <br />promptness such written clarifications or interpreta- <br />tions of the requirements of the Contract Documents <br />as ENGINEER may determine necessary, which shall <br />be consistent with the intent of and reasonably <br />inferable from the Contract Documents. Such written <br />clarifications and interpretations will be binding on <br />OWNER and CONTRACTOR. If OWNER and CON- <br />TRACTOR are unable to agree on entitlement to or on <br />the amount or extent, if any, of any adjustment in the <br />Contract Price or Contract Times, or both, that should <br />be allowed as a result of a written clarification or <br />interpretation, a Claim may be made therefor as <br />provided in paragraph 10.05. <br />9.05 Authorized Variations in Work <br />A. ENGINEER may authorize minor variations in <br />the Work from the requirements of the Contract <br />Documents which do not involve an adjustment in the <br />Contract Price or the Contract Times and are compati- <br />ble with the design concept of the completed Project <br />as a functioning whole as indicated by the Contract <br />Documents. Thee may he __Ge^' lished by a Field <br />(lrrler acid well be h'ndi n OWNER rl is <br />q GA <br />GONTt?A(`TOR who hall perform the 1A1 k i......iyed <br />pFemptly. if OWNER and CONTRACTOR are WRablee <br />to ogFee GR entitlement # 9R the amGun# x+ + <br />ifany—ef aRy adjustment in the <br />G o-Atr art Timet er hath a a result f e C' ld !l d <br />i 0.05 <br />9.06 Rejecting Defective Work <br />A. ENGINEER will have authority to disapprove <br />or reject Work which ENGINEER believes to be <br />DIV 0-4—Conditions of the Contract <br />00700-28 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS0009 North County Library Addition\1-Admin\Bids\13id Documents\DIV 0 -4 -Conditions of the Contract.doc <br />