Laserfiche WebLink
accordance with the dispute resolution <br />procedures set forth in Article 16; or <br />2. if no such dispute resolution <br />procedures have been set forth in Article 16, a <br />written notice of intention to appeal from <br />ENGINEER's written decision is delivered by <br />OWNER or CONTRACTOR to the other and to <br />ENGINEER within 30 days after the date of <br />such decision, and a formal proceeding is <br />instituted by the appealing party in a forum of <br />competent jurisdiction within 60 days after the <br />date of such decision or within 60 days after <br />Substantial Completion, whichever is later <br />(unless otherwise agreed in writing by OWNER <br />and CONTRACTOR), to exercise such rights or <br />remedies as the appealing party may have with <br />respect to such Claim, dispute, or other matter <br />in accordance with applicable Laws and <br />Regulations. <br />C. If ENGINEER does not render a formal <br />decision in writing within the time stated in paragraph <br />10.05.6, a decision denying the Claim in its entirety <br />shall be deemed to have been issued 31 days after <br />receipt of the last submittal of the claimant or the last <br />submittal of the opposing party, if any. <br />D. No Claim for an adjustment in Contract Price <br />or Contract Times (or Milestones) will be valid if not <br />submitted in accordance with this paragraph 10.05. <br />ARTICLE 11 - COST OF THE WORK; CASH <br />ALLOWANCES; UNIT PRICE WORK <br />11.01 Cost of the Work <br />A. Costs Included: The term Cost of the Work <br />means the sum of all costs necessarily incurred and <br />paid by CONTRACTOR in the proper performance of <br />the Work. When the value of any Work covered by a <br />Change Order or when a Claim for an adjustment in <br />Contract Price is determined on the basis of Cost of <br />the Work, the costs to be reimbursed to <br />CONTRACTOR will be only those additional or <br />incremental costs required because of the change in <br />the Work or because of the event giving rise to the <br />Claim. Except as otherwise may be agreed to in <br />writing by OWNER, such costs shall be in amounts no <br />higher than those prevailing in the locality of the <br />Project, shall include only the following items, and <br />shall not include any of the costs itemized in para- <br />graph 11.01.6. <br />2. Cost of all materials and equipment <br />furnished and incorporated in the Work, includ- <br />ing costs of transportation and storage thereof, <br />and Suppliers' field services required in <br />connection therewith. All cash discounts shall <br />accrue to CONTRACTOR unless OWNER <br />deposits funds with CONTRACTOR with which <br />to make payments, in which case the cash <br />discounts shall accrue to OWNER. All trade <br />discounts, rebates and refunds and returns <br />from sale of surplus materials and equipment <br />shall accrue to OWNER, and CONTRACTOR <br />shall make provisions so that they may be <br />obtained. <br />3. Payments made by CONTRACTOR <br />to Subcontractors for Work performed by <br />Subcontractors. If required by OWNER, CON- <br />TRACTOR shall obtain competitive bids from <br />subcontractors acceptable to OWNER and <br />CONTRACTOR and shall deliver such bids to <br />OWNER, who will then determine, with the <br />advice of ENGINEER, which bids, if any, will be <br />acceptable. If any subcontract provides that the <br />Subcontractor is to be paid on the basis of Cost <br />of the Work plus a fee, the Subcontractor's <br />Cost of the Work and fee shall be determined <br />in the same manner as CONTRACTOR's Cost <br />of the Work and fee as provided in this para- <br />graph 11.01. <br />4. Costs of special consultants <br />(including but not limited to engineers, <br />architects, testing laboratories, surveyors, <br />attorneys, and accountants) employed for <br />services specifically related to the Work. <br />DIV 0-4—Conditions of the Contract <br />00700-31 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2009 North County Library Additior\1-Admin\Bid9\B1d Documents\DIV 0-4—conditions of the Contract.doc <br />