My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-075A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-075A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2022 3:16:34 PM
Creation date
7/7/2022 1:03:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/12/2022
Control Number
2022-075A
Agenda Item Number
12.G.2.
Entity Name
Proctor Construction Company, LLC
Subject
North County Library Expansion
Project Number
IRC-2009
Bid Number
2022021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
deemed to be delays within the control of CONTRAC- <br />TOR. <br />12.05 Delays Beyond OWNER's and <br />CONTRACTOR's Control <br />A. Where CONTRACTOR is prevented from <br />completing any part of the Work within the Contract <br />Times (or Milestones) due to delay beyond the control <br />of both OWNER and CONTRACTOR, an extension of <br />the Contract Times (or Milestones) in an amount <br />equal to the time lost due to such delay shall be <br />CONTRACTOR's sole and exclusive remedy for such <br />delay. <br />12.06 Delay Damages <br />A. In no event shall OWNER or ENGINEER be <br />liable to CONTRACTOR, any Subcontractor, any <br />Supplier, or any other person or organization, or to any <br />surety for or employee or agent of any of them, for <br />damages arising out of or resulting from: <br />1. delays caused by or within the control <br />of CONTRACTOR; or <br />2. delays beyond the control of both <br />OWNER and CONTRACTOR including but not <br />limited to fires, floods, epidemics, abnormal <br />weather conditions, acts of God, or acts or <br />neglect by utility owners or other contractors <br />performing other work as contemplated by <br />Article 7. <br />B. Nothing in this paragraph 12.06 bars a <br />change in Contract Price pursuant to this Article 12 to <br />compensate CONTRACTOR due to delay, <br />interference, or disruption directly attributable to <br />actions or inactions of OWNER or anyone for whom <br />OWNER is responsible. <br />ARTICLE 13 - TESTS AND INSPECTIONS; <br />CORRECTION, REMOVAL OR ACCEPTANCE OF <br />DEFECTIVE WORK <br />13.01 Notice of Defects <br />A. Prompt notice of all defective Work of which <br />OWNER or ENGINEER has actual knowledge will be <br />given to CONTRACTOR. All defective Work may be <br />rejected, corrected, or accepted as provided in this <br />Article 13. <br />13.02 Access to Work <br />A. OWNER, ENGINEER, ENGINEER's Con- <br />sultants, other representatives and personnel of <br />OWNER, independent testing laboratories, and <br />governmental agencies with jurisdictional interests will <br />have access to the Site and the Work at reasonable <br />times for their observation, inspecting, and testing. <br />CONTRACTOR shall provide them proper and safe <br />conditions for such access and advise them of <br />CONTRACTOR's Site safety procedures and <br />programs so that they may comply therewith as <br />applicable. <br />13.03 Tests and Inspections <br />A. CONTRACTOR shall give ENGINEER timely <br />notice of readiness of the Work for all required <br />inspections, tests, or approvals and shall cooperate <br />with inspection and testing personnel to facilitate <br />required inspections or tests. <br />B. OWNER shall employ —and pay for the <br />Of aR iRdePIBRdent testing laboratory to <br />C. If Laws or Regulations of any public body <br />having jurisdiction require any Work (or part thereof) <br />specifically to be inspected, tested, or approved by an <br />employee or other representative of such public body, <br />CONTRACTOR shall assume full responsibility for <br />arranging and obtaining such inspections, tests, or <br />approvals, pay all costs in connection therewith, and <br />furnish ENGINEER the required certificates of inspec- <br />tion or approval. <br />D. CONTRACTOR shall be responsible for <br />arranging and obtaining and shall pay all costs in <br />connection with any inspections, tests, or approvals <br />required for OWNER's and ENGINEER's acceptance <br />of materials or equipment to be incorporated in the <br />Work; or acceptance of materials, mix designs, or <br />equipment submitted for approval prior to <br />CONTRACTOR's purchase thereof for incorporation <br />in the Work. Such inspections, tests, or approvals <br />shall be performed by organizations acceptable to <br />OWNER and ENGINEER. <br />DIV 0-4—Conditions of the Contract <br />00700-35 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\2009 North County Library Additior\1-Admin\Bids\Bid Documents\DIV 0-4—Conditions of the Contract.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.