Laserfiche WebLink
A. In case of discrepancy, the governing order of the documents shall be as follows: <br />1. <br />Written Interpretations <br />2. <br />Addenda <br />3. <br />Specifications <br />4. <br />Supplementary Conditions to the General Conditions <br />5. <br />General Conditions <br />6. <br />Approved Shop Drawings <br />7. <br />Drawings <br />8. <br />Referenced Standards. <br />B. Written/computed dimensions shall govern over scaled dimensions. <br />SC -4.02 Subsurface and Physical Conditions <br />SC -4.02 Add the following new paragraphs immediately after paragraph GC -4.02.8: <br />C. In the preparation of Drawings and Specifications, ENGINEER or ENGINEER's Consultants <br />relied upon the following reports of explorations and tests of subsurface conditions at <br />the Site: NONE <br />SC -5.01 Performance, Payment and Other Bonds <br />SC -5.01.A. Delete paragraph GC -5.01.A in its entirety and insert the following paragraphs in its place: <br />Within fifteen (15) days of receipt of the Contract Documents for execution, the <br />CONTRACTOR shall furnish a Public Construction Bond in an amount equal to <br />100% of the Contract Price. <br />1. In lieu of the Public Construction Bond, the CONTRACTOR may furnish an <br />alternative form of security in the form of cash, money order, certified check, <br />cashier's check, irrevocable letter of credit or a security as listed in Part II of F.S. <br />Chapter 625. Any such alternative form of security shall be for the same purpose, <br />and be for the same amount and subject to the same conditions as those <br />applicable to the bond otherwise required. The determination of the value of an <br />alternative form of security shall be made by the OWNER. <br />2. Such Bond shall continue in effect for one (1) year after acceptance of the Work <br />by the OWNER. <br />3. The OWNER shall record the Public Construction Bond with the Public Record <br />Section of the Indian River County Courthouse located at 200016th Avenue, Vero <br />Beach, Florida 32960. <br />SC -5.03 Certificates of Insurance <br />SC -5.03 Delete the second sentence of paragraph GC -5.03 in its entirety. <br />SC -5.04 CONTRACTOR's Liability Insurance <br />SC -5.04 Add the following new paragraphs immediately after paragraph GC -5.04.8: <br />Supplementary Conditions - 00800-4 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS0009 North County Library Addition\1-Admin0ds0d Documents\DIV 0 5 Conditions of the Contract.docx <br />