My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-075A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-075A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2022 3:16:34 PM
Creation date
7/7/2022 1:03:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/12/2022
Control Number
2022-075A
Agenda Item Number
12.G.2.
Entity Name
Proctor Construction Company, LLC
Subject
North County Library Expansion
Project Number
IRC-2009
Bid Number
2022021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Purchasing Division <br />purchasing@ircgov.com <br />ADDENDUM NO. <br />Issue Date: <br />Project Name: <br />Bid Number: <br />Bid Opening Date: <br />1 <br />February 4, 2022 <br />North County Library Expansion <br />2022021 <br />March 8, 2022 at 2:00 PM <br />This addendum is being released to give response to the questions received and to make modifications to <br />the Bid Documents. <br />The information and documents contained in this addendum are hereby incorporated in the invitation to <br />bid. This addendum must be acknowledged where indicated on the Bid Form, or the proposal may be <br />declared non-responsive. <br />Modifications to Bid Documents <br />ADD Geotechnical Exploration Report <br />Questions and Answers <br />1. Are VE alternatives accepted for products as long as they match the basis of design? It will lower <br />costs as well as reduce lead times. Section 08411 allows for multiple manufacturers as shown <br />below. Other Manufacturers different than those specified will be accepted as long as they meet <br />or exceed the design specification in Section 08411 and the storefront details as shown on the <br />construction documents. Available Manufacturers: Subject to compliance with requirements, <br />manufacturers offering products that may be incorporated into the Work include, but are not <br />limited to, the following: Arch Aluminum & Glass Co., Inc. Kawneer, YKK, Vistawall Architectural <br />Products. <br />2. Plan sheet A1.11 indicates we are to tie into the existing FACP but the drawings don't show where <br />it is located, it's manufacture model nor placement of new device locations. Please advise. See <br />Sprinkler Notes #10 for contractor required field verification of the existing FACP location and <br />manufacturer. FACP is location in the Main Lobby on the East wall. Fire Alarm contractor is <br />responsible for designing a system with new device location to meet code. <br />3. Please provide a copy of the Geo Tech report for soil conditions. See attached. <br />4. Plan sheet A2.20 and A4.10 detail 5 indicates cement board fascia. Plan sheet A4.20 and A4.21 <br />indicates cedar fascia. Please advise. Cement board fascia shall be used for the fascia. <br />
The URL can be used to link to this page
Your browser does not support the video tag.