My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-130
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2022 2:47:40 PM
Creation date
7/21/2022 12:18:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/05/2022
Control Number
2022-130
Agenda Item Number
12.E.1.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No. 50 for Emergency Operation Center
Fiber Infrastructure Expansion Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK ORDER NUMBER 50 <br />EMERGENCY OPERATIONS CENTER FIBER INFRASTRUCTURE <br />EXPANSION PROJECT <br />This Work Order Number 50 is entered into as of this _ day of <br />2022, pursuant to that certain Continuing Consulting Engineering Services Agreement for <br />Professional Services entered into as of this 17' day of April, 2018 (collectively referred to as <br />the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State <br />of Florida ("COUNTY") and KIMLEY-HORN AND ASSOCIATES, INC. ("Consultant"). <br />The COUNTY has selected the Consultant to perform the professional services set forth on <br />Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. <br />The professional services will be performed by the Consultant for the fee schedule set forth in <br />Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this reference. <br />The Consultant will perform the professional services within the timeframe more particularly <br />set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by <br />this reference all in accordance with the terms and provisions set forth in the Agreement. <br />Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict <br />with the terms of the Agreement and the terms of the Agreement shall be deemed to be <br />incorporated in each individual Work Order as if fully set forth herein. <br />EXHIBIT A — SCOPE OF WORK <br />The COUNTY desires to retain Consultant services to develop construction documents and <br />obtain jurisdictional approvals to expand the COUNTY's fiber network facilities between the <br />COUNTY Administrative Building on 27th Street and the COUNTY Emergency Operations Center <br />on 43rd Avenue, approximately 4.0 miles. The intended utility corridor is intended to consist of <br />Indian River Farms Water Control District (IRFWCD) Main Relief Canal and 43rd Avenue roadway <br />rights-of-way. The Consultant will integrate existing fiber infrastructure into the proposed plan, <br />where available. <br />A. Fiber Infrastructure Plans: <br />The Consultant shall develop construction documents necessary to support the proposed <br />improvements along the corridors identified above. The following outlines that tasks and <br />submittals to be made: <br />Initial Plan Submittal: <br />The Consultant will create raster -based plan sheets (11"x17", 40 scale) to facilitate <br />delineation of the proposed fiber optic cable (FOC) infrastructure improvements. Existing <br />right-of-way will be depicted using information collected during the Limited Topographic <br />1IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.