My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-130
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2022 2:47:40 PM
Creation date
7/21/2022 12:18:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/05/2022
Control Number
2022-130
Agenda Item Number
12.E.1.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No. 50 for Emergency Operation Center
Fiber Infrastructure Expansion Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 50 <br />Emergency Operations <br />Center Fiber Expansion <br />Project <br />Surveyors in Chapter 61G17-6, Florida Administrative Code, pursuant to Section 472.027, <br />Florida Statutes. The survey will include: <br />1. Establishment of a project wide Horizontal Control Network within the PROJECT <br />LIMITS. <br />2. Establishment of a project wide Vertical Control Network within the PROJECT <br />LIMITS. All elevations will be referenced to NAVD 1988 datum. <br />3. Supplemental spot elevations and topographic feature information will be <br />collected in sufficient detail to locate, design and construct the contemplated <br />improvements. <br />C. Jurisdictional Permitting: <br />The Consultant will perform analysis necessary to prepare jurisdictional permits to support <br />the above-described improvements with the following agencies: <br />• Indian River County Right -of -Way Use Permit <br />• City of Vero Beach Site Plan Modification Permit <br />• Indian River Farms Water Control District Utility Construction Permit <br />All permit fees will be paid directly by the COUNTY and are not included in the lump sum <br />fees. <br />D. Franchise Utility Coordination: <br />The Consultant will coordinate with franchise utility operators in the vicinity of the project <br />such that the proposed construction activities can be developed to minimize impacts to <br />existing utilities located within the project limits. Franchise utility adjustments, designed by <br />the respective franchise utility operator, will be requested by the Consultant and reflected <br />within the prepared construction documents. <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.