Laserfiche WebLink
Work Order No. 50 <br />Emergency Operations <br />Center Fiber Expansion <br />Project <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately ten (10) months from the Notice to Proceed (NTP). <br />NTP <br />Initial Submittal (40% Design Drawings) <br />Constructability Submittal (80% Design Drawings) <br />Production Submittal (100% Design Drawings) <br />contingent upon BOCC approval <br />5 months following NTP <br />8 months following NTP <br />10 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 5 of 6 <br />