My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/21/2022
CBCC
>
Meetings
>
2020's
>
2022
>
06/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2022 10:31:20 AM
Creation date
7/25/2022 10:11:06 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/21/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2022 -0203 -PAA -EQ <br />DOCKET NO. 20220072 -EQ <br />PAGE 8 <br />Attachment A <br />Second Revised Sheet No. 9.031 <br />FLORIDA PONVER & 11431ITCOMPANY Cancels First Revised Sheet No. 9.031 <br />(Continued from Sheet No. 9.030) <br />QS Facility <br />The QS contemplates, installing operating and maintaining a <br />KVA enerati% facility located <br />at (hereinafter called the "Facility"). The Facility is designed to <br />produce a maximum of, kilowatts ("KW") of electric power at an 85% lagging to 85% leading power factor. The <br />Facility's location and generation capabilities are as described in the table below. <br />TE42MOLOGYAND GLNERATORCAPAMU-I'l ES <br />Location: Specific legal description (e.g., metes and bounds or other legal <br />description with street address required) <br />City: <br />County: <br />Generator Type (Induction or Synchronous) <br />Type of Facility (Hydrogen produced froin sources other than fossil fuels, hiomags <br />as defined In Section 25-17.210 (2) F.A.C. , solar energy, geothermal energy, wind <br />energy, ocean energy, hydroelectric power, waste heat from sulfuric acid <br />manufacturing operations: or <100KNVcogencrator) <br />Technology <br />Fuel Type and Sourer <br />Generator Rating (KVA) <br />Maximum Capability(KW) <br />Minimum Load <br />Peaking Capability <br />Net Output (KW) <br />Power Factor(%) <br />Operating Voltage (kV) <br />Peak Internal Loadk-VV <br />The following sections (a) through (e) are applicable to Renewable Energy Facilities ("REFs'� and section (e) is only <br />applicable to Qualifying Facilities with a design capacity cf 100 KW or less: <br />(a) If the QS is a REF, the QS represents and warrants that (i) the sole source(s) of fuel or power used by the Facility <br />to produce energy for sale to FPL during the term of this Contract shall be such sources as are defined in and <br />provided for pursuant to Sections 366.91(2) (a) and (b), Florida Statutes, and FPSC Rules 25-17.71((1) and (2) <br />FXC:; (ii) Fossil fuels -shall be limited to the minimum quantities necessary for start-up, shut -down and for <br />operating stability at minimum load', and (iii) the REF is capable of generating the amount of capacity pursuant to <br />Section 5 of this Agreement without the use of fossil fuels, <br />(b) The Parties agree and acknowledge that if the Q8 is a REF, the QS will not charge for, and FPL shall have no <br />obligation to pay for, any electrical energy produced by the Facility from a source of fuel or power except as <br />specifically provided for in paragraph i(a) above, <br />(Continued on Sheet No, 9.032) <br />Effective: July 13, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.