Laserfiche WebLink
ORDER NO. PSC -2022 -0203 -PAA -EQ <br />DOCKET NO. 20220072 -EQ <br />PAGE 28 <br />Attachment A <br />Seventh Revised Sheet No. 10.300 <br />MORIDA POIVVER & LIGHT COMPANY Cancels Sixth Revised Sheet No. 10J00 <br />RATE SCHEDULE Q&2 <br />APPENDIX A <br />TO THE STANDARD OFFER CONTRACT <br />STANDARD RATE FOR PURCHAsEOF FIRM CAPACITY AND ENERGY <br />FROM A RENEWABLE ENERGY FACIUTY <br />ORA QUALIFYING FACILITY WITH A DESIGN CAPACITY OF 100 ICW OR LESS <br />$0MAILE <br />Q&32, Firm Captwity, imdEnergy <br />AVATTABLF <br />The Company will, under the provisions of this Schedule and the Company's "Standard Offer Contract for the Purchase of Firm <br />Capacity and Energy from a Renewable Energy Facility or a Qualifying Facility with a design capacity of 100 KW or less. <br />("Standard Offer Contract'), purchase Firm capacity and energy offered by a Renewable Energy Facility specified in Section <br />366,91, Florida Statutes or by a Qualifying Facility with a design capacity of 100 KIN' or less as specified in FPSC Rule 25-17- <br />0832(4) and which is either directly or indirectly interconnected with the Company. Both of these types of facilities shall also be <br />referred to herein as Qualified Seller or "QS". <br />The Gonipany will petition the FPSC for closure upon any of the following as related to the generating unit upon which this <br />standard offer contract is Nwed i,c, the, Avoided Unit : (a) a request for proposals (RFP) pursuant to Rule 25-22.082, F.A,C,, is <br />issued, (b) the Company files a petition for a need determination or commences construction of the Avoided Unit when the <br />gencrat.4 unit is not subject to Rule 25-22.082, F.A.C. or (c) the generating unit ulin which the standard offer contract is based is <br />no longer part of the utility's generation plan, as evidenced by a petition to that effect filed with the Commission or by the utility's <br />most recent Ten Year Site Plan. <br />APPLICABLE <br />To Renewable Energy Facilities as specifted in Section 366.91, Florida Statutes producing capacity and energy from qualified <br />renewable resources for sale to the Company on a firm basis pursuant to the terms and conditions of this schedule and the, <br />Company's "Standard Offer Contract', Firm Rcmvable Capacity and Renewable Energy are capacity and cneriw, produced and <br />sold by a QS pursuant to the Standard Offer Contract provisions addressing (among other things) quantity, time and reliability of <br />delivery. <br />To Qualifying Facilities ('QF'), with a design capacity of 100 KW or less, as specified in FPSC Rule 25-17,0832(4)(a) producing <br />capacity and energy for salt to the Company on a firm basis pursuant to the terms and conditions of this schedule and the <br />Company's -Standard Offer Contract', Firm Capacity and Energy are &-=ribcd by FPSC Rule 25-17.0832. FAC., and are <br />capacity and energy produced and sold by a QF pursuant to the Standard Offer Contract provisions addressing (among other things) <br />quantity, time and reliability of delivery, <br />CHARACTER OF SERViCF <br />Purchases within the areas served by the Company sball be. at the option of the Company, single or three phase, 60 hertz afternating <br />current at any available standard Company voltage. Purchases from outside the areas served by the Company shall be three <br />phase, (A hertz alternating current at the voltage level available at the interchange Point between the Company and the entity <br />delivering the Firm Energy and Capacity from the Q.S. <br />UNTATION <br />Purchases under this schedule are subject to Section 366.91, Florida Statutes and/or FPSC Rules 25-17.0832 through 25-17.091, <br />F.A,C., and 25-17.200 through 25-17.310 F.A.0 and are limitedto those Facilities which: <br />A. Commit to commence deliveries of firm capacity and energy no later than the in-service date of the Avoided <br />Unit, as detailed in Appendix 11, and to continue such deliveries for a period of at least 10 years up to a <br />maximum of the life of the avoided unit; <br />Are not currently under contract with the Company or with any other entity for the Facility's output for the <br />period specified above <br />(Continued on Sheet No. 10301) <br />Issued by: Tiffany Cohen, Senior Director, Regulatory Rates, Cost of Service and Systems <br />Effective: January 1, 2022 <br />