Laserfiche WebLink
ORDER NO. PSC -2022 -0203 -PAA -EQ <br />DOCKET NO. 20220072 -EQ <br />PAGE 42 <br />FIX)RIDA PONVER & 1033 ITCOMI'ANNY <br />Attachment A <br />Second Revised Sheet No. 10.313 <br />Cancels- First Revised Sheet No. 10,313 <br />JAPPE-MIX R <br />TO THE STANDARD OFFER CONTRACT <br />FOR THE PURCHASE OF FIRIM CAPACITY AND ENERGY <br />FROM RMWAHLE ENERGY FACHATMS <br />OR QUALIFYING FACILITIES WITH A DESIGN CAPACITY OF log XW OR LESS PAY <br />FOR PERFORMANCE PROVISIONS MONTHLY CAPACITY PAYMENT CALCULATION <br />1. Monthly Capacity Payments (MCP) for each Monthly Billing period shall be, computed nocordingto the fdlowing: <br />A, India emit that the Annual Capacity Billing Factor (AC BF") u defined below, is less thau Mai., than no Monday Capacity Payment shall be <br />due, That is; <br />MCP — 0 <br />In the event that theACBFis equal toorgreater than 80%but less than 946/6,then the MouthlyCapacity by usiTW <br />the loumvitig formula - <br />- <br />MCP- f3CP.-. [1 14x(AC8F-94%)jxCC <br />C. In do event that the ACBF is equal to or greater than 940,6, then dur Monday Capacity Pxfnmit shall be calculated by using the MioNving <br />romidic <br />MCP- BCP x a: <br />%Vhere: <br />MCP <br />BCP Ile" Caimcity Payment in S"IMonshas specified in FPVs Rate SdWuleQS-Z. <br />CC Committed Capacity in KW. <br />ACBF Annual Capacity Billing Factor. This factor is calculated using the 12 monalis rolling average ofthe Monday Capaity <br />Factor, This 12 Inonal rolling average "I be defused as dw Vum of am 12 consecutive Monday Cupwity Fack'n; <br />preceding the date of calculation, divided by 12, During the first 12 consecutive Monday Bil ht* Periodst, cettiaactteiitg <br />with the first Monday Billing Period in which Capacity payments are to be mikiii, the calulatum of the Annual <br />Capacity Billing Factor shall be performed as follows: (a) doing the first Monthly M114 Period, dieAnnualCapacity <br />Billing Factor shall be equal to the Monthly Capacity Factor (b) thereafter, the calculation of the Annual Capacity <br />Billing Factor shall beconituttod by dividing the sunt of the Monthly Capacity Factors during the first yftev Monthly <br />Billing Periods in which Capacity payments are to be 1118110 by OW RMUM 017NIMMY Billing I'MiOdO WhiCh have <br />elapsed. This calculation shall be performed at the end of each Monday Wing period w1fil en outat Monday Billing <br />Porioils love deprod to calculate a true 12 -mouth rolling avenge Annual Capacity Billing Fwtor. Periods durnq <br />which die Facility has tertrixxmily set ita CA)mmiued Capacity equal to 0 KW due to a Force Majeure event pursuant to <br />Section 16 shall be excluded from the applicable capacity factor calculation, <br />MCF Monday Capacity Factcv. The two of (i) the Hcurly Factors of the Non -Dispatch H,'Aus plats (ii) the Hourly. <br />Factors of the Diqmtch Hours or the Hourly factors of the hours when FPL requested reduced deliveries pursuant to <br />Secticim 3.4.6 and SAS (Reduced Delivery Hour); divided by the number of hours in the Monthly Billing Period. <br />HFNDH Hourly Factor *fa Non -Dispatch Hour, The energy received during die hour divided by the Committed Capacity, <br />Fcc purposes of calculating the Hourly Factor of a Non -Dispatch flow the energy moeived shall not exceed the <br />Committed Capacity. <br />HFDH Hourly Factor of a Di soh Hour or a Reduced Delivery Hour, The wheduled energy received divided by the <br />scheduled energy rixituisted. For purposes of calculating die Hourly Factor of Dispatch Hour or die Hourly Factor <br />ofa Reduced Delivery Hour the scheduled energy received shall not exceed the scheduled energy requested. <br />On -Peak Hours -'I'hw hours occurring April I through October 31 Mondays through Fridays, from 12 nom to 9:00 p.m. excluding <br />Memorial Day, Independence Day and Labor Day; and November I through March 31 Mondays through Fridays <br />from 6.00 win, to MOO R.M' mid 6:00 pm, to 10:00 pm, prevailing Eastern time excluding Thanksgiving Day, <br />Christmas Day and New Year's Day. FPL shall have the right to charge smeh Ott- Peak Hous by providing the QS <br />s unninium of thirty calendar days'adviincenotice, <br />Monthly Baling — The period liquiming on the fast calendar day of each cal"Wor mouth, except that the initial Monday Baling <br />Period period shall consist of Die period begiuning 12.'01 am. on the Capacity Delivery Period Date and anditig with <br />die last calendar day osuch month, <br />Scheduled Energy and Dispatch Hours are us: defined in Section 8.4.7 ofthe Standard Oft Corm or, <br />]-sued by: S. E. Roinig, Director, Rates untlTuriffs <br />Effective; August 27, 2015 <br />