Laserfiche WebLink
the above site plan release conditions. No other special environmental features exist within <br />the area of development. <br />11. Stormwater Management: The applicant submitted a preliminary stormwater management <br />plan that has been reviewed and approved by Public Works. That plan proposes to utilize the <br />existing grove furrows/ditches to convey and treat the minimal amount of stormwater runoff <br />that will be generated by the project. Prior to site plan release, the applicant must obtain a <br />County Type "B" Stormwater Permit pursuant to Chapter 930 of the County LDRs. <br />12. Utilities: The project is outside of the Urban Service Area and County water/sewer services <br />are not available. Therefore, water/wastewater services will be provided via private on-site <br />well(s) and septic systems(s). The County Department of Utility Services and the Department <br />of Health have reviewed and approved the proposed site plan. <br />13. Specific Land Use Criteria: Pursuant to LDR section 971.08(2), the following criteria for <br />agricultural industries apply to this project: <br />Agricultural industries may be allowed to locate within the A-1, A-2, or A-3 districts <br />only upon a finding by the reviewing body that such industries are directly related to <br />active agricultural operations and that such industries, due to the characteristics of <br />the operation, would not be more appropriately located in an industrial zoning <br />district; <br />Note: The Subject property is located within the A-2 zoning district, and is a <br />sub -part of a f 900 -acre farm. Therefore, it is staffs opinion that the <br />unique nature of the proposed operation, coupled with the project's <br />location, size, and scale, is more appropriate in the A-2 zoning district, <br />rather than an industrial zoning district. The operation is also directly tied <br />to an active agriculture operation because many of the ingredients will be <br />grown/produced directly on the same project site. <br />2. All buildings and structures shall be located at least one hundred (100) feet from all <br />property lines; <br />Note: The site plan demonstrates that all structures are at least 100 feet from all <br />property lines. <br />3. Agricultural industries shall include but not be limited to stockyards, feedlots and <br />packinghouses; <br />Note: The proposed project would qualify as an agricultural industry as there <br />are agricultural components like sugar cane and fruit fields that are being <br />implemented as part of this project. There are also aspects of the project <br />that would be most similar to a packinghouse where produce or other <br />goods are processed, packaged, and distributed. In this case a distillery <br />will be in operation where farm products and ingredients will be processed <br />on-site and then packaged, stored/aged, and distributed to wholesale <br />consumers. <br />175 <br />C:\Users\ufc-prod\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@640BD366\@BCL@64OBD366.docx 3 <br />