My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-133
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2022 12:57:16 PM
Creation date
8/5/2022 11:38:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/12/2022
Control Number
2022-133
Agenda Item Number
8.J.
Entity Name
Indian River Lagoon Council
Subject
Agency Cost-Share Agreement for Phase 4 Restoration
for the Lost Tree Island Conservation Area
Contract# IRL2022-07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract# IRL2022-07 <br />Encumbrance# GLO 1- 1895/GLO 1-2205 <br />work will be initiated prior to the execution of the grant agreement and is not part of the <br />proposed IRLNEP funding. <br />• Task 2. Treatment of Vegetation Re -growth: The County will inspect and spot treat areas <br />where exotic or nuisance species have recruited into the mulched areas. These treatments <br />will continue through the planting and perpetual maintenance of the site. <br />• Task 3. Prepare Documents and Bid Re -vegetation Effort: The County will prepare <br />procurement documents and obtain bids for the planting of the mulched areas. The bid <br />documents will require that the contractor provide a guarantee period for all installed <br />materials. <br />• Task 4. Mobilization of Planting and Plant Installation: The contractor will be required to <br />contract grow any materials that are not readily available for planting. The County desires <br />that the planting occur in the wet season, which would facilitate the natural growth of the <br />installed plants. The contractor will be required to submit a proposed schedule for <br />planting with their bid. This task also includes the installation of the plant materials on the <br />Earman island site. <br />• Task 5. Inspection of Planted Materials: The County will inspect the installed materials on <br />an established schedule to verify that plant materials are thriving, and that any damaged <br />or dead materials are replaced at the contractor expense during the guarantee period. <br />• Task 6. Volunteer Clean -Up Events: The County will arrange up to 2 volunteer clean-up <br />events on the LTICA to clear planted areas of debris, and to raise awareness about the <br />need to control litter in the IRL. <br />• Task 7. Quarterly Progress Reports: The County will prepare and submit quarterly <br />progress reports after the first quarter following contract execution and continuing to <br />project completion. These reports will summarize the status of enhancement efforts, <br />including a narrative description of work completed and accompanying photographs. <br />• Task 8. Project Administration and Final Report: The County will submit a project final <br />report. The final report will provide a summary of the enhancement effort and <br />accompanying photographs and other required information. <br />VII. TIME FRAMES and DELIVERABLES: <br />• Task 1: Mechanical Treatment of Exotics (6/13/2022-8/12/2022) <br />Deliverable: Summary of activities completed in first quarter Report. <br />Deliverable Due: 1/31/2023 <br />• Task 2: Treatment of Vegetation Re -growth (8/1/2022-9/30/2023) <br />Deliverable: Summary of activities to be included in quarterly reports and final <br />report. <br />Deliverable Due: 1/31/2023, 4/30/2023, 7/31/2023, and 9/30/2023 <br />• Task 3: Prepare documents and bid -vegetation effort (12/5/2022-1/30/2023) <br />Deliverable: Bid documents <br />Deliverable Due: 4/30/2023 <br />• Task 4: Mobilization of Planting and Plant Installation (6/6/2023-7/8/2023) <br />Deliverable: Installation Report summarizing the number of plants planted, and 2 <br />high resolution photos of completed effort. <br />Deliverable Due: 7/31/2023 <br />• Task 5: Inspection of Planted Materials (7/8/2023-9/29/2023) <br />Deliverable: Monitoring/Inspection Results to be included in Final Report <br />Deliverable Due: 9/30/2023 <br />• Task 6: Volunteer Clean-up Events (1/28/2023-8/26/2023) <br />Deliverable: Summary of Events to be included in Final Report and copies of all <br />signed volunteer forms. <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.