My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-140
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2022 11:02:05 AM
Creation date
8/8/2022 11:00:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/12/2022
Control Number
2022-140
Agenda Item Number
15.B.6.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
. Amendment No. 1 to CCNA2018 Work Order 47
for Roadway and Drainage Improvements at the IRC Landfill
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT NO. 1 <br />WORK ORDER NUMBER 47 <br />ROADWAY IMPROVEMENTS AND DRAINAGE IMPROVEMENTS AT THE IRC <br />LANDFILL <br />EXHIBIT A <br />SCOPE OF WORK <br />PROJECT UNDERSTANDING <br />Indian River County (County) solid waste disposal district (SWDD) previously authorized <br />Kimley-Horn and Associates (Consultant) to provide engineering services related to the paving of <br />the yard waste drop-off area driveway and minor drainage improvements. As the design of the <br />drainage improvements progressed, SWDD staff requested a modification to add a weir structure <br />to an existing swale that was not originally accounted for in the design effort. This amendment <br />provides for additional design and construction observation services associated with the weir <br />structure, and minor revisions to the stormwater design. <br />In addition, the site plan permitting process has required slightly more coordination with the teams <br />designing the various ongoing projects than initially anticipated. Amendment No. 1 includes <br />additional time for this effort. The amended scope of services is presented below. <br />SCOPE OF SERVICES <br />Task 1: Landfill Roadway Improvements <br />No change. <br />Task 2: Drainage Improvements (Lump Sum) <br />This task has been amended to include the addition of a weir structure between the C&D landfill <br />swale and the eastern swale. This connection is currently bermed and the original design called <br />for removal of the berm and restoration of the flow between the two segments. SWDD has since <br />requested that the berm be replaced with a drivable weir structure, which requires additional civil <br />and structural design services. <br />Task 3: Site Plan Coordination <br />This task was initially intended to compile design documents from the various design teams <br />working on the ongoing landfill projects into a single Major Site Plan Permit application of the <br />County's Planning Department. The task required more effort than originally anticipated. An <br />additional fee is being requested to complete the permit process. <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.