My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-141
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2022 11:06:37 AM
Creation date
8/8/2022 11:06:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/12/2022
Control Number
2022-141
Agenda Item Number
15.B.7.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendment No.1 to CCNA2018 Work Order 42 for
Centrate to Leachate Tank Conversion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
spilling of leachate into areas that may impact surface or groundwaters. Rather, <br /> SWDD determined that the Alternate Procedure with additional monitoring and <br /> spill prevention provisions would better serve the intent. <br /> 2. The Consultant evaluated the required footprint of secondary containment to meet <br /> the rule (110% of the storage capacity of the tank, or 550,000 gallons). The <br /> proximity of the existing GST to the lift station,pump manifold and electrical <br /> panels, coupled with the configuration of the proposed evaporation system and <br /> existing utilities made it prohibitive to construct the required containment. <br /> Furthermore,the Consultant reviewed original geotechnical reports and GST <br /> design documents to determine if the required vertical containment(liner or <br /> compaction below the tank)was suitable for meeting the intent of the Rule. <br /> Ultimately,the available information was not sufficient to make this <br /> determination. <br /> 3. An Alternate Procedure allows the applicant to request approval of an alternate <br /> method of meeting the intent of a given Rule. In this case, the Consultant prepared <br /> a request that identified additional monitoring,testing and tank modifications that <br /> could serve to prevent or quickly mitigate a spill or leak in lieu of constructing a <br /> physical containment structure. The Consultant will participate in several phone <br /> calls with FDEP staff,prepare supporting documents, coordinate with project <br /> teams(regarding minimum storage requirements) and SCADA consultants <br /> (regarding instrumentation and controls available to monitor for leaks)to prepare <br /> the package to be submitted to FDEP. Several follow-up meetings and a <br /> resubmittal of additional information will also be conducted. <br /> The original Scope of Services did not anticipate a requirement for modification of the <br /> FDEP Solid Waste Operations permit; however,the requirement for the Alternate <br /> Procedure triggered the requirement. The Consultant will prepare the request for an <br /> Alternate Procedure from FDEP including supporting documentation and will assist <br /> SWDD's permitting consultant to incorporate this change into the ongoing Operations <br /> Permit Modification(by others). <br /> Amendment No. 1 provides for these additional services associated with evaluating the <br /> secondary containment options and pursuing the Alternate Procedure request. <br /> Task 5: Construction Phase Services (Not-to-Exceed) <br /> No changes. <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.