Laserfiche WebLink
�-1 <br />SEMINOLE SHORES <br />ST. CHRISTOPHER HARBOR <br />Contract C-110 Sec. "D" <br />SEWER ASSESSMENT ROLL <br />Construction <br />$71,425.00 <br />Engineering 10.9% <br />$ <br />7,785.33 <br />Assessment Roll <br />$ <br />400.00 <br />Field Inspection 4.0% <br />$ <br />2,857.00 <br />Field Staking & Testing 2,5% <br />$ <br />1,785.63 <br />Contingencies 10% <br />$ <br />7,142.50 <br />Assessment/Lot TOTAL: $91,395.46 <br />(Based on 36 Lots) <br />$ 2,538.76 <br />Credit/lot on 84, F.M. oversize <br />in lieu of 4" F.M. required <br />to The Moorings discharge - <br />109.03 <br />Charge/lot for oversize <br />F.M. to Vero Beach <br />190.00 <br />TOTAL ASSESSMENT/LOT: $ 2,619.73 <br />